Skip to content

Open nowPosted 30 hours agoWe saw it 20 min after it went up

AI Datacenter Construction Manager

Bitdeer Technologies Group165 open roles

Where
Austin, Texas, United States
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowAI Datacenter Construction ManagerBitdeer Technologies Group · Austin, Texas, United States
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on Bitdeer Technologies Group's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

13.3% of postings close within 7 days. Measured by our own scanner across the market. Bitdeer Technologies Group postings stay open a median of 20 days.

Share of postings closed within
  1. 2.1%1 day
  2. 4.6%3 days
  3. 13.3%7 days
  4. 21.3%14 days
  5. 35.7%30 days
  6. 59.1%60 days
This job: posted 30 hours ago

Bitdeer Technologies Group median: 20 days open

The posting

About Bitdeer

Bitdeer is a world-leading technology company for Bitcoin mining and AI cloud.

Bitdeer is committed to providing comprehensive Bitcoin mining solutions for its customers. Apart from designing industry-leading ASIC chips and manufacturing mining rigs, the Group handles complex processes involved in computing across the value chain. This includes equipment procurement, transport logistics, datacenter design and construction, equipment management, and network and facility operations. Bitdeer also offers advanced cloud capabilities to customers with a high demand for artificial intelligence.

Headquartered in Singapore, Bitdeer operates globally with a diversified 3 GW energy portfolio, and deploys Bitcoin mining and HPC datacenters in the United States, Bhutan, Norway, Canada, Malaysia, and Ethiopia.

We are seeking

We are seeking an AI Datacenter Construction Manager to lead on-site delivery of Bitdeer’s AI data center builds. Reporting to the VP, Data Center Construction, you will be Bitdeer’s senior representative on site, accountable for safety, schedule, quality, and cost from mobilization through energization, commissioning, and turnover.

You will manage the general contractor and trade partners day to day, coordinate discipline leads, and keep the site moving to plan. The ideal candidate has run large data center or mission-critical sites from the owner’s or general contractor’s side.

Location: Candidates will work on site as needed and should be based in one of the following areas, primarily in Texas and Ohio: Austin, TX; Rockdale, TX; Abilene, TX; Houston, TX; Dallas, TX; Massillon, OH; Clarington, OH; Columbus, OH; Akron, OH; or Pittsburgh, PA.

What you will be responsible for

Site Leadership

  • Owner’s Representative: Act as Bitdeer’s on-site lead and single point of accountability for the build.
  • Contractor Management: Direct the general contractor and trade partners on safety, quality, productivity, and schedule.
  • Daily Coordination: Run site coordination meetings, look-ahead planning, and site logistics.

Schedule & Cost

  • Schedule Delivery: Drive the site schedule and short-interval plans, and flag and recover critical-path slippage.
  • Cost Oversight: Review change requests, quantities, and pay applications with cost and procurement.
  • Progress Reporting: Report progress, risks, and issues to the VP, Data Center Construction and the TPM.

Safety & Quality

  • Site Safety: Enforce site safety plans with the EHS Manager and lead by example in the field.
  • Quality Control: Verify work against drawings and specifications with the QA/QC Manager.
  • Issue Resolution: Resolve RFIs and field issues quickly with design and engineering.

Interfaces & Turnover

  • Discipline Coordination: Coordinate civil, electrical/HV, mechanical, fiber, and ELV scopes on site.
  • Authorities & Utilities: Work with local authorities, inspectors, and utilities on permits, inspections, and site access.
  • Turnover: Support commissioning and deliver punch-list closure, as-builts, and turnover.

How you will stand out

  • Experience: 10+ years in construction management, including 5+ years leading data center or mission-critical sites.
  • Project Scale: Experience delivering large, fast-track builds with multiple concurrent trades.
  • Technical Breadth: Working knowledge of civil, structural, MEP, and commissioning on data center projects.
  • Field Leadership: Proven ability to manage general contractors and trade partners on site.
  • Education: Bachelor’s degree in Construction Management, Engineering, or a related field, or equivalent experience.
  • Certifications: Professional certifications such as OSHA 30-Hour, PMP, or CCM.
  • Site-Based Work: Willingness to be based on site and to travel to or relocate to active project locations.
  • Field Leadership: Earns respect from contractors and crews and leads from the front.
  • Decisiveness: Makes sound calls quickly when field conditions change.
  • Communication: Keeps leadership informed with clear, timely updates.
  • Accountability: Owns the outcome of the site end to end.

What you will experience working with us

  • A culture that values authenticity and diverse perspectives.
  • An inclusive, respectful environment with open workspaces and an energetic, start-up spirit.
  • A fast-growing company with opportunities to network with industry pioneers and enthusiasts.
  • The ability to contribute directly and make an impact on the future of the digital asset and AI computing industry.
  • Involvement in new projects and in developing processes/systems.
  • Personal accountability, autonomy, rapid growth, and learning opportunities.
  • Attractive benefits and development such as training and mentoring.

_____________________________

Bitdeer is committed to providing equal employment opportunities in accordance with country, state, and local laws. Bitdeer does not discriminate against employees or applicants based on conditions such as race, color, gender identity and/or expression, sexual orientation, marital and/or parental status, religion, political opinion, nationality, ethnic background or social origin, social status, disability, age, indigenous status, and union.

From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against Bitdeer Technologies Group's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on Bitdeer Technologies Group's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    Bitdeer Technologies Group's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.