Skip to content

Open nowPosted 12 hours ago

Data Center Construction – Mid - Senior Commissioning Project Manager

MGAC40 open roles

Where
Charlest, SC
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowData Center Construction – Mid - Senior Commissioning Project ManagerMGAC · Charlest, SC
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on MGAC's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

10.5% of postings close within 7 days. Measured by our own scanner across the market. MGAC postings stay open a median of 36 days.

Share of postings closed within
  1. 2.1%1 day
  2. 4.3%3 days
  3. 10.5%7 days
  4. 15.9%14 days
  5. 34.1%30 days
This job: posted 12 hours ago

MGAC median: 36 days open

The posting

It’s an exciting time to join MGAC!

MGAC is a global boutique consultancy dedicated to managing and representing our clients’ best interests. Our success is rooted in hiring exceptional people who are driven to do challenging work with the unique blend of experience, integrity, creativity, and commitment that separates us from our competitors.

We have three simple goals: to do the most interesting and challenging work, to have fun working together, and to build a successful business in the process.

This position requires significant onsite presence in Charleston, SC with travel required based on project and client needs.

Unlock Your Potential

We're looking for candidates eager to lead complex mission-critical projects, influence project outcomes, and drive operational excellence across large-scale data center developments. Here's what will set you up for success at MGAC:

  • 5+ years of experience in commissioning, construction management, mission-critical facilities, or data center infrastructure projects.
  • 3+ years of experience managing commissioning teams, consultants, and multidisciplinary project stakeholders.
  • Bachelor’s degree in Engineering, Construction Management, Mechanical Engineering, Electrical Engineering, or a related technical field. Equivalent experience will be considered.
  • Extensive experience supporting hyperscale, colocation, enterprise, or mission-critical data center construction projects.
  • Experience leading Level 1-5 commissioning activities for complex MEP and critical infrastructure systems.
  • Strong knowledge of electrical distribution, UPS systems, generators, HVAC systems, controls, BMS, EPMS, SCADA, and integrated systems testing.
  • Excellent analytical, organizational, leadership, problem-solving, presentation, interpersonal, verbal, and written communication skills.
  • Proven ability to manage multiple projects simultaneously while balancing schedule, budget, risk, quality, and client expectations.
  • A collaborative leader who thrives in fast-paced environments and is passionate about delivering exceptional project outcomes.

What You'll Be Doing

MGAC's Critical Environments team manages some of the most complex and high-profile data center projects in the industry. As a trusted owner's representative, we help clients navigate technical challenges, mitigate risks, and ensure facilities are delivered ready for operations. As a Data Center Construction – Mid - Senior Commissioning Project Manager you will lead commissioning strategy and execution across large-scale mission-critical projects and serve as a key advisor to clients throughout the project lifecycle.

Commissioning Leadership

  • Lead and manage commissioning teams including Commissioning Managers, Engineers, Project Managers, and third-party commissioning partners.
  • Oversee commissioning activities across multiple concurrent data center construction projects.
  • Develop commissioning strategies, resource plans, project schedules, and execution methodologies.
  • Provide technical leadership throughout design, construction, testing, and turnover phases.
  • Mentor and develop team members while promoting a culture of quality, accountability, and safety.

Commissioning Program Delivery

  • Direct the full lifecycle of Level 1-5 commissioning activities.
  • Review and approve commissioning plans, scripts, procedures, reports, and turnover documentation.
  • Oversee equipment start-up, functional performance testing, integrated systems testing (IST), load bank testing, and operational readiness activities.
  • Develop and maintain commissioning logs, deficiency logs, equipment checklists, SOPs, MOPs, and project documentation.
  • Ensure consistency and compliance with company quality processes and commissioning standards.

Technical Oversight

  • Lead commissioning efforts for critical infrastructure systems, including:
  • Electrical distribution systems
  • Medium- and low-voltage power systems
  • UPS systems and battery plants
  • Standby generators and fuel systems
  • Chillers and cooling plants
  • CRAH and CRAC units
  • Building Management Systems (BMS)
  • EPMS and SCADA systems
  • Fire alarm and life safety systems
  • Emergency power systems
  • Review design documents, specifications, shop drawings, and equipment submittals for commissioning requirements.
  • Support troubleshooting, issue resolution, and deficiency management during testing and startup activities.
  • Verify testing results and ensure systems meet owner project requirements and operational objectives.

Client Relationship Management

  • Serve as a trusted advisor and primary commissioning lead for clients and project stakeholders.
  • Facilitate commissioning meetings, project reviews, and progress reporting.
  • Coordinate activities among contractors, consultants, vendors, equipment manufacturers, and owner representatives.
  • Proactively identify project risks and develop mitigation and recovery strategies.
  • Maintain the client's vision while ensuring successful project delivery.

Our Critical Environments project work continues to experience tremendous growth, with a robust pipeline of hyperscale, colocation, and mission-critical projects across North America.

Why Work With Us?

  • 30+ years strong in North America and growing fast with a positive, energizing culture.
  • Consistently recognized as a Top Workplace with a true employee-first mindset.
  • Entrepreneurial spirit encouraged. Bring fresh ideas and exceed client expectations.
  • Global reach, yet agile and client-focused like a boutique firm.
  • Your voice matters. Flat structure, open doors, and recognition for your contributions.
  • Exposure to some of the most complex and innovative data center projects in the industry.
  • Strong work-life balance, generous PTO, and top-tier wellness benefits.

Beyond the Paycheck: Discover Our Benefits

  • Recognized as a Top Workplace for over a decade.
  • Vacation starts on day one. Accrue 3 weeks per year, plus a paid birthday off.
  • 8 sick days and 9 paid holidays annually for full-time employees.
  • Competitive benefits that support both personal and professional growth.
  • Professional development opportunities and support for industry certifications.

Salary Range

$110,000-$160,000 per year (commensurate with experience)

The advertised salary range is intended as a general guideline and may vary based on factors such as experience, expertise, certifications, and location. This base salary does not reflect the full compensation package, which may include bonuses, a 401(k) match, and other benefits.

From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against MGAC's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on MGAC's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    MGAC's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.