Skip to content

Open nowPosted 120 days ago

Quality Engineer I - Data Center Construction

Mortenson External89 open roles

Pay
$76,600 – $95,800 a year
Where
Pampa, TX, United States
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowQuality Engineer I - Data Center ConstructionMortenson External · Pampa, TX, United States
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on Mortenson External's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

8.2% of postings close within 7 days. Measured by our own scanner across the market. Mortenson External postings stay open a median of 4 days.

Share of postings closed within
  1. 1.8%1 day
  2. 3.6%3 days
  3. 8.2%7 days
  4. 15.2%14 days
  5. 34.0%30 days
This job: posted 120 days ago

Mortenson External median: 4 days open

The posting

Job Description

SUMMARY

Mortenson is currently seeking a Quality Engineer I that will be responsible for quality control processes on a project for assigned scopes of work, potentially partnering with senior quality managers on larger projects, while managing, monitoring, reporting, and analyzing project quality performance and leading corrective/preventive actions.

RESPONSIBILITIES

  • Foster strong teamwork orientation and promote diversity
  • Build strong cross-cultural relationships and influence others at all levels, resolving cross-cultural conflicts appropriately
  • Serve as a technical resource and guide for project team staff
  • Implement the Quality Management Plan and system for all assigned divisions of work from notice to proceed through final acceptance
  • Oversee quality inspection of materials and work, conduct quality inspections, and identify non-conformances with project requirements
  • Manage Non-Conformance Notices (NCN) and the Request for Information (RFI) process through corrective actions
  • Train and manage project personnel on their roles, responsibilities, and processes to support Mortenson’s Quality System
  • Discuss and resolve technical issues with customers, architects, engineers, and subcontractors, ensuring design documents meet customer requirements
  • Capture and share best practices used on the project, and identify opportunities to enhance margin or minimize risk through means-and-methods or material selection
  • Effectively work and build relationships with individuals of diverse backgrounds and organizational levels

QUALIFICATIONS

  • Bachelor’s degree in Construction, Civil, or Architectural Engineering, related field, or equivalent experience
  • Minimum one year of experience within the design, engineering, or construction industry
  • Current driver’s license
  • Ability to conduct constructability reviews, quality reviews of design documents, shop drawing reviews, and submittal reviews for assigned scopes of work
  • Knowledge of the design-bid-build process
  • Good mechanical aptitude and knowledge in the use of large cranes, mechanical systems, and utility-based medium and high voltage electrical systems
  • Self-starter, independent worker, and computer literate
  • Strong teamwork orientation
  • Basic knowledge of construction processes, systems, and project management
  • Active listening skills and effective communication, including openness to diverse input and feedback

A few benefits offered include:

(for Non-Craft & Non-Union Craft working 25+ hours / week)

  • Medical and prescription drug plans that includes no additional cost vision coverage
  • Dental plan
  • 401k retirement plan with a generous Mortenson match
  • Paid time off, holidays, and other paid leaves
  • Employer paid Life, AD&D, and disability insurance
  • No-Cost mental health tool and concierge with extensive work-life resources
  • Tuition reimbursement
  • Adoption Assistance
  • Gym Membership Discount Program

The base pay range for this role is $76,600 MIN - $95,800 MAX. (Actual range is higher for the following office locations: Denver, CO and Chicago, IL – 5%, Seattle, WA, and Portland, OR – 10%, Washington, D.C. – 12.5%).

Base pay is positioned within the range based on several factors including an individual’s knowledge, skills, and experience, with consideration given to internal equity. This position is eligible for Mortenson’s incentive plan.

Please make note:

  • Visa sponsorship is not offered for this position.
  • Our postings are typically open a minimum of 5 days and an average of 44 days.

ABOUT MORTENSON

As a top builder, developer, and EPC (Engineering, Procurement, and Construction), our expertise spans markets like sports, renewable energy, data centers, healthcare, and more. We are builders at heart, working to ensure the built environment has a lasting positive impact.

Let’s Redefine Possible®

Equal Employment Opportunity

Your uniqueness brings new and creative perspectives to the team. Mortenson is committed to providing equal opportunities of employment (EOE) to all individuals, regardless of your race, religion, gender, national origin, age, veteran status, disability, marital status or any other legally protected category.

Other Items to Note

  • Mortenson reserves the right to hire any individual without legal or financial obligation on unwanted solicitations. No agency emails, calls, or solicitations are accepted without a valid agreement.
  • Must be currently legally authorized to work in the U.S. without sponsorship for employment visa status (e.g., H1B status, 0-1, TN, CPT, OPT, etc.). We are unable to sponsor or take over sponsorship of an employment Visa at this time.
From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against Mortenson External's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on Mortenson External's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    Mortenson External's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Nearby

Live postings like this one

Same employer first, then the same role elsewhere.

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.