Skip to content

Open nowPosted 91 days ago

Senior Safety Engineer - Data Center Construction

Mortenson External89 open roles

Pay
$89,500 – $120,800 a year
Where
Lincoln, NE, United States
Work mode
On site
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowSenior Safety Engineer - Data Center ConstructionMortenson External · Lincoln, NE, United States
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on Mortenson External's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

8.2% of postings close within 7 days. Measured by our own scanner across the market. Mortenson External postings stay open a median of 4 days.

Share of postings closed within
  1. 1.8%1 day
  2. 3.6%3 days
  3. 8.2%7 days
  4. 15.2%14 days
  5. 34.0%30 days
This job: posted 91 days ago

Mortenson External median: 4 days open

The posting

Job Description

SUMMARY

Mortenson is currently seeking a Senior Safety Engineer that will be responsible for implementing Mortenson’s Zero Injury Safety program across multiple project sites and ensuring a safe work environment for team members, subcontractors, and visitors to the construction work site.

This position offers opportunities at both levels 1 and 2, allowing candidates to apply based on their experience and qualifications. Compensation for this role is determined based on factors such as experience and location.

RESPONSIBILITIES

  • Implement and administer safety programs at worksites, including site-specific safety activities and training programs
  • Document and track safety violations, conduct safety audits, and analyze loss control data
  • Lead OSHA reporting, monitor subcontractor activities, and review safety submittals
  • Record, monitor, and analyze safety, injury, and hazard statistics
  • Provide safety-related information, evaluate industrial hygiene concerns, and maintain knowledge of safety standards
  • Serve as a resource for safety issues, attend safety meetings, and assist with major incident analysis
  • Work with client safety personnel, union representatives, and insurance risk engineers
  • Ensure maintenance and inspection of safety equipment and build relationships with diverse backgrounds and organizational levels

QUALIFICATIONS

  • Bachelor’s degree in safety, occupational health, or equivalent;

OR

  • High school diploma with CHST Certification, OSHA 500, and a minimum of 10 years construction experience leading crews and planning work, to include at least six years as a dedicated construction safety professional responsible for managing project safety programs, conducting / reviewing hazard analyses and developing controls, conducting safety training, and planning work activities or equivalent experience in a relevant field
  • Minimum of four years of construction safety experience
  • Current valid driver’s license
  • Detail-oriented with the ability to organize and manage multiple project tasks
  • Proficiency in Microsoft Office and relevant safety software programs
  • Positive and professional attitude with strong customer service skills
  • Ability to interpret and communicate Mortenson policies effectively
  • Willingness to travel up to 100%

A few benefits offered include:

(for Non-Craft & Non-Union Craft working 25+ hours / week)

  • Medical and prescription drug plans that includes no additional cost vision coverage
  • Dental plan
  • 401k retirement plan with a generous Mortenson match
  • Paid time off, holidays, and other paid leaves
  • Employer paid Life, AD&D, and disability insurance
  • No-Cost mental health tool and concierge with extensive work-life resources
  • Tuition reimbursement
  • Adoption Assistance
  • Gym Membership Discount Program
  • Senior Safety Engineer I:
  • MINIMUM QUALIFICATIONS: See Above
  • The base pay range for this role is $89,500 MIN - $120,800 MAX.
  • Senior Safety Engineer II:
  • MINIMUM QUALIFICATIONS: 10 years construction experience leading crews and planning work, including six years as a dedicated construction safety professional training, and planning work activities or equivalent experience in a relevant field
  • Minimum of five years of construction safety experience
  • The base pay range for this role is $95,700 MIN - $129,200 MAX.
  • (Actual range is higher for the following office locations: Denver, CO and Chicago, IL – 5%, Seattle, WA, and Portland, OR – 10%, Washington, D.C. – 12.5%).

Base pay is positioned within the range based on several factors including an individual’s knowledge, skills, and experience, with consideration given to internal equity. This position is eligible for Mortenson’s incentive plan.

Please make note:

  • Visa sponsorship is not offered for this position.
  • Our postings are typically open a minimum of 5 days and an average of 44 days.

ABOUT MORTENSON

As a top builder, developer, and EPC (Engineering, Procurement, and Construction), our expertise spans markets like sports, renewable energy, data centers, healthcare, and more. We are builders at heart, working to ensure the built environment has a lasting positive impact.

Let’s Redefine Possible®

Equal Employment Opportunity

Your uniqueness brings new and creative perspectives to the team. Mortenson is committed to providing equal opportunities of employment (EOE) to all individuals, regardless of your race, religion, gender, national origin, age, veteran status, disability, marital status or any other legally protected category.

Other Items to Note

  • Mortenson reserves the right to hire any individual without legal or financial obligation on unwanted solicitations. No agency emails, calls, or solicitations are accepted without a valid agreement.
  • Must be currently legally authorized to work in the U.S. without sponsorship for employment visa status (e.g., H1B status, 0-1, TN, CPT, OPT, etc.). We are unable to sponsor or take over sponsorship of an employment Visa at this time.
From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against Mortenson External's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on Mortenson External's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    Mortenson External's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Nearby

Live postings like this one

Same employer first, then the same role elsewhere.

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.