Skip to content

Open nowPosted 24 hours agoWe saw it 103 min after it went up

HVAC Superintendent- (Onsite-Pampa Texas/Data Center Construction)

Mullins Mechanical67 open roles

Where
Amarillo, TX
Work mode
On site
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowHVAC Superintendent- (Onsite-Pampa Texas/Data Center Construction)Mullins Mechanical · Amarillo, TX
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on Mullins Mechanical's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

9.5% of postings close within 7 days. Measured by our own scanner across the market. Mullins Mechanical postings stay open a median of 11 days.

Share of postings closed within
  1. 1.8%1 day
  2. 3.9%3 days
  3. 9.5%7 days
  4. 15.5%14 days
  5. 33.9%30 days
This job: posted 24 hours ago

Mullins Mechanical median: 11 days open

The posting

HVAC Superintendent (Onsite Pampa, Texas Data Center)

Mullins Mechanical is a leader in industrial and large commercial mechanical, plumbing, HVAC construction projects. Our projects are often in the industrial and manufacturing environments, such as manufacturing facilities, automotive plants, chemical plants, distribution centers, warehouses, and other large commercial facilities. We are a self-performing specialty contractor specializing in design-build applications, HVAC systems, plumbing, process piping systems, boiler and chiller systems, equipment installation and rigging, plant relocation and maintenance, and metal fabrication.

Responsibilities:

  • Report directly to the Field Operations Director and provide regular updates regarding field commissioning progress, manpower, startup activities, project readiness, and field challenges.
  • Execute the commissioning plan developed by the Commissioning Project Manager.
  • Direct and supervise all daily field commissioning activities on assigned projects.
  • Lead commissioning technicians, startup personnel, subcontractors, manufacturers, and specialty vendors throughout commissioning activities.
  • Coordinate daily manpower, work assignments, and commissioning priorities.
  • Develop and maintain daily and weekly startup schedules that align with project milestones.
  • Coordinate equipment startup with manufacturers, controls contractors, TAB agencies, electrical contractors, and subcontractors.
  • Verify that systems are complete, operational, and ready for startup prior to commissioning activities.
  • Supervise startup and functional performance testing of HVAC, plumbing, process piping, mechanical equipment, controls, and integrated building systems.
  • Coordinate system flushing, pressure testing, balancing, controls integration, and equipment verification.
  • Identify commissioning deficiencies, troubleshoot system issues, coordinate corrective actions, and verify successful resolution.
  • Maintain field commissioning punch lists, deficiency logs, startup records, and testing documentation.
  • Coordinate commissioning activities with Project Superintendents, Project Managers, Project Engineers, Quality, Safety, and field operations personnel.
  • Ensure commissioning activities comply with contract requirements, project specifications, manufacturer recommendations, and company quality standards.
  • Conduct startup safety meetings and ensure compliance with Lockout/Tagout procedures and other commissioning safety requirements.
  • Support owner demonstrations, training sessions, and final system turnover.
  • Submit complete and accurate field commissioning documentation to the Commissioning Project Manager for project closeout.
  • Mentor field personnel on commissioning procedures, startup best practices, and safe execution of commissioning activities.
  • Additional responsibilities may be assigned as needed.

Qualifications:

  • High school diploma or GED required; technical degree, apprenticeship, or trade certification preferred.
  • Minimum of ten (10) years of experience in mechanical construction, HVAC, plumbing, process piping, controls, startup, or commissioning.
  • Minimum of five (5) years of supervisory experience leading field operations on large-scale construction projects.
  • Extensive experience with equipment startup, testing, balancing, controls integration, and system commissioning.
  • Thorough understanding of construction sequencing, field operations, startup procedures, and integrated building systems.
  • Ability to read and interpret construction drawings, specifications, P&IDs, equipment submittals, control diagrams, and sequences of operation.
  • Strong troubleshooting, leadership, organizational, and communication skills.
  • Experience coordinating subcontractors, equipment manufacturers, and specialty vendors during commissioning activities.
  • Proficiency with Microsoft Office Suite, Procore, Bluebeam, and construction management software.
  • OSHA 30 certification required or ability to obtain.
  • Commissioning certification (CxA, CCP, CBCP, QCxP, or equivalent) preferred.
  • Ability to travel extensively to assigned project sites.

Essential Job Functions:

Work at heights — including ladders, scaffolds, lifts, platforms, mezzanines, and elevated structures up to and exceeding 100 feet.

  • Work around moving equipment — such as forklifts, cranes, aerial lifts, skid steers, and other heavy machinery.
  • Standing and walking for extended periods
  • Perform physically demanding tasks — including lifting, carrying, pushing, pulling, bending, kneeling, crawling, climbing, and reaching.
  • Maintain situational awareness in dynamic, noisy, and high‑hazard environments.
  • Use required PPE including hard hats, safety glasses, gloves, hearing protection, fall protection, and respiratory protection when applicable.
  • Work in confined or restricted spaces as required by project scope.
  • Operate or use hand and power tools safely and effectively.
  • Follow safety protocols, lockout/tagout procedures, and hazard‑control measures.
  • Communicate effectively with team members, supervisors, and equipment operators using verbal instructions, radios, and hand signals.

Physical Demands:

Lifting and carrying materials and equipment up to 50 lbs frequently

  • Working on uneven terrain including dirt, gravel, mud, rebar mats, and unfinished surfaces.
  • Climbing ladders and stairs repeatedly throughout the workday.
  • Bending, stooping, kneeling, and crouching to perform installation, repair, or inspection tasks.
  • Repetitive motions including gripping, twisting, hammering, and tool operation.
  • Full use of hands, arms, legs, and balance to safely navigate job sites and perform tasks.
  • Visual and auditory acuity sufficient to identify hazards, read instructions, and communicate in high‑noise environments.

Environmental Conditions:

  • Year‑round outdoor environments including extreme heat, cold, rain, snow, and wind.
  • Industrial indoor environments such as data centers, manufacturing floors, mechanical rooms, and utility spaces.
  • High‑noise areas requiring hearing protection.
  • Dusty, dirty, or fume‑producing environments depending on project scope.
  • Tight or congested workspaces with multiple trades working simultaneously.
  • Varying lighting conditions including low‑light or task‑light‑only areas.

Cognitive & Safety‑Critical Requirements

Maintain alertness and awareness for long periods.

  • Recognize and avoid hazards including fall hazards, electrical hazards, pinch points, and equipment movement.
  • Follow written and verbal instructions accurately.
  • Make quick, safe decisions in changing conditions.
  • Work independently or as part of a team depending on task needs.

Equal Employment Opportunity: Mullin Mechanical is an Equal Opportunity Employer and does not discriminate based on race, color, religion, sex, national origin, age, disability, veteran status, or any other protected characteristic.

Disclaimer: This job description is not intended to be an exhaustive list of all duties, responsibilities, or qualifications associated with the position. Duties and responsibilities may change at any time with or without notice.

Join Us Mullins Mechanical ranked #243 on the 2024 ENR Top Specialty Contractors list, #48 in the Nation and #5 in the Southeast among Firms in Mechanical. We’re proud to be one of the fastest growing privately held companies in America. We’re a self-performing specialty contractor specializing in design-build applications, HVAC systems, plumbing, process piping systems, boiler and chiller systems, equipment installation and rigging, plant relocation and maintenance, fire protection, and metal fabrication. Our projects are often in industrial and heavy commercial environments such as manufacturing facilities, automotive plants, chemical plants, distribution centers, warehouses, data centers, and other large facilities.

From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against Mullins Mechanical's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on Mullins Mechanical's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    Mullins Mechanical's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.