Skip to content

Open nowPosted 2 days ago

QA/QC Manager | Data Centre Construction Projects

MyCareersFuture93,320 open roles

Pay
SGD 9,500 – SGD 12,000 a month
Where
Singapore
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowQA/QC Manager | Data Centre Construction ProjectsMyCareersFuture · Singapore
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on MyCareersFuture's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

9.1% of postings close within 7 days. Measured by our own scanner across the market. MyCareersFuture postings stay open a median of 7 days.

Share of postings closed within
  1. 1.8%1 day
  2. 3.9%3 days
  3. 9.1%7 days
  4. 15.5%14 days
  5. 34.0%30 days
This job: posted 2 days ago

MyCareersFuture median: 7 days open

The posting

Lead Quality Assurance & Quality Control Across Major Data Centre Building Construction Projects

Company: Leading A1 Main Contractor

Position: QA/QC Manager

Working Week: Monday – Friday, 5 Days per Week

Salary: Upto SGD 12,000 (Commensurate with Experience)

Project Types: Data Centre | Industrial | Commercial Buildings

Project Location: Singapore

COMPENSATION & BENEFITS

Salary Package: Competitive Base Salary + AWS + Performance Bonus + Manager Allowance + Site Allowance + Travel Allowance

Benefits: Training & Career Development + Medical & Dental Insurance + Other Attractive Employee Benefits

ABOUT THE OPPORTUNITY

We are partnering with a leading Japanese A1 Main Contractor delivering major building projects across Singapore. We are seeking an experienced QA/QC Manager to lead quality assurance and quality control activities across large-scale Residential, Commercial and Mixed-Use developments, ensuring construction works meet project, contractual and quality requirements.

ROLE & RESPONSIBILITIES

  • Lead and manage Quality Assurance and Quality Control (QA/QC) activities throughout the construction lifecycle of major Data Centre building projects.
  • Develop, implement and monitor Project Quality Plans (PQP), Inspection and Test Plans (ITP), quality procedures and inspection schedules.
  • Oversee quality inspections across Civil & Structural, Architectural and M&E works, ensuring compliance with approved drawings, specifications and project requirements.
  • Manage non-conformance reports (NCR), corrective and preventive actions, quality audits and defect rectification, ensuring timely resolution.
  • Coordinate with clients, consultants, subcontractors and project teams on quality inspections, material approvals, testing and project quality deliverables.
  • Lead and supervise the QA/QC team, maintaining quality documentation, inspection records, audit reports and handover requirements.

REQUIREMENTS

  • Bachelor's Degree in Civil Engineering, Mechanical Engineering, Electrical Engineering, Construction Management or equivalent.
  • Minimum 8 years of relevant construction QA/QC experience, including experience managing quality systems on major building projects.
  • Strong experience in Data Centre, Industrial or large-scale Commercial building construction, preferably with an A1/Main Contractor in Singapore.
  • Good knowledge of QA/QC procedures, Project Quality Plans, Inspection and Test Plans, quality audits, NCR management and construction inspections.
  • Familiarity with ISO 9001 Quality Management Systems, Singapore construction standards and multidisciplinary C&S, Architectural and M&E quality requirements.
  • Strong leadership, technical coordination and problem-solving capabilities, with experience managing QA/QC teams, subcontractors and project stakeholders.

CAREER PROSPECT

An excellent opportunity to join a leading A1 Main Contractor delivering major Data Centre building construction projects in Singapore, offering long-term career stability, exposure to technically complex developments and strong career progression towards Senior QA/QC Manager and Head of Quality positions.

For more information, please contact Banen Associates or simply click APPLY, and we will get in touch with you.

Email: [email protected]

WhatsApp: +65 9810 0904

Applicants are encouraged to apply directly through MyCareersFuture.

From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against MyCareersFuture's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on MyCareersFuture's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    MyCareersFuture's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Nearby

Live postings like this one

Same employer first, then the same role elsewhere.

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.