Skip to content

Open nowPosted 3 days ago

Principal Data Center Construction Manager

Oracle / OCI372 open roles

Where
TX, United States, Abilene, TX, United States
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowPrincipal Data Center Construction ManagerOracle / OCI · TX, United States, Abilene, TX, United States
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on Oracle / OCI's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

8.1% of postings close within 7 days. Measured by our own scanner across the market. Oracle / OCI postings stay open a median of 28 days.

Share of postings closed within
  1. 1.8%1 day
  2. 3.6%3 days
  3. 8.1%7 days
  4. 15.2%14 days
  5. 33.9%30 days
This job: posted 3 days ago

Oracle / OCI median: 28 days open

The posting

Job Description

About the Role:

Oracle Cloud Infrastructure (OCI) — Data Center Infrastructure Delivery

Location: Abilene / Shackelford, Texas area

Work Location Requirement: This role is expected to be approximately 85% on-site at the Abilene/Shackelford data center location.

Oracle Cloud Infrastructure (OCI) is seeking a Senior Data Center MEP PM to support the delivery of large-scale data center infrastructure in the Abilene/Shackelford, Texas area. This role will be part of the OCI Data Center Infrastructure Delivery organization and will help drive the successful execution of mission-critical mechanical, electrical, and plumbing systems across hyperscale data center construction projects.

The Senior Data Center MEP PM will work closely with internal Oracle teams, construction partners, developer-led construction teams, QA/QC oversight teams, design consultants, commissioning agents, contractors, vendors, and other key stakeholders to ensure that MEP scope is delivered safely, on schedule, within quality expectations, and aligned with Oracle’s infrastructure standards.

This role may be suited for candidates with either an electrical or mechanical background, with strong preference for experience managing electrical MEP systems in data center or mission-critical environments.

Responsibilities

The Senior Data Center MEP PM will be responsible for supporting and overseeing MEP delivery activities throughout the construction lifecycle, including planning, construction execution, QA/QC coordination, commissioning readiness, turnover, and closeout.

Responsibilities include:

  • Provide field-based project management support for MEP systems on hyperscale data center construction projects.
  • Work closely with construction teams, developer representatives, QA/QC oversight teams, general contractors, trade partners, and vendors to monitor execution of MEP scope.
  • Support delivery of electrical and/or mechanical systems, including power distribution, switchgear, UPS systems, generators, cooling systems, piping, controls, fire protection, and associated infrastructure.
  • Track project schedule, milestones, constraints, risks, and dependencies related to MEP construction activities.
  • Review and monitor installation quality, field progress, construction documentation, issue resolution, and punch-list closure.
  • Partner with QA/QC teams to support inspections, documentation, non-conformance tracking, corrective actions, and quality verification.
  • Coordinate with commissioning teams to ensure systems are installed, tested, and turned over in accordance with project requirements.
  • Identify risks, blockers, design conflicts, constructability issues, and schedule impacts; escalate issues with clear recommendations.
  • Support review of RFIs, submittals, change impacts, field directives, and technical coordination items.
  • Participate in construction meetings, MEP coordination meetings, look-ahead planning sessions, QA/QC reviews, and commissioning readiness discussions.
  • Maintain clear communication with Oracle stakeholders regarding project status, progress, risks, and critical issues.
  • Promote a strong safety culture and support compliance with site safety expectations and construction best practices.
  • Help ensure data center infrastructure is delivered to Oracle’s performance, reliability, quality, and operational readiness standards.

Qualifications:

  • 5+ years of experience in data center, hyperscale, mission-critical, industrial, or large-scale construction project delivery.
  • Direct experience supporting MEP construction on data center or mission-critical infrastructure projects.
  • Experience with electrical MEP systems such as medium-voltage distribution, switchgear, UPS, generators, transformers, power distribution, grounding, controls, and related systems.
  • Mechanical background may also be considered with relevant data center MEP experience, including cooling, chilled water, CRAH/CRAC, piping, pumps, air handling, fire protection, or controls.
  • Prior experience working on hyperscale data center projects is required.
  • Strong understanding of construction project execution, field coordination, QA/QC processes, schedule tracking, and issue resolution.
  • Experience working with general contractors, trade contractors, construction managers, developers, design teams, vendors, and commissioning teams.
  • Ability to read and interpret construction drawings, specifications, schedules, submittals, RFIs, and technical documentation.
  • Strong communication skills with the ability to clearly summarize project risks, issues, status, and next steps.
  • Demonstrated ability to work in a fast-paced construction environment with multiple stakeholders and competing priorities.
  • Must be willing and able to work approximately 85% on-site in the Abilene/Shackelford, Texas area.
  • Ability to travel locally as needed to support project execution, vendor coordination, or stakeholder meetings.

Preferred Qualifications:

  • Bachelor’s degree in Electrical Engineering, Mechanical Engineering, Construction Management, or a related technical field.
  • Strong electrical background with experience in data center power infrastructure, including utility coordination, medium-voltage systems, backup power, redundancy, and commissioning.
  • Experience with hyperscale cloud, colocation, or large enterprise data center construction.
  • Familiarity with data center commissioning levels, integrated systems testing, turnover packages, and operational readiness requirements.
  • Experience with construction reporting tools, scheduling platforms, document control systems, and issue tracking processes such as Procore, Autodesk Construction Cloud, Primavera P6, Microsoft Project, Aconex, Bluebeam, SharePoint, or similar tools.
  • Experience managing or supporting QA/QC processes, inspection readiness, non-conformance resolution, and punch-list management.
  • Knowledge of construction safety practices, electrical safety, lockout/tagout awareness, and mission-critical site protocols.
  • PMP, CCM, PE, LEED, or other relevant professional certification.
  • Experience working with developer-led construction delivery models.
  • Ability to influence without direct authority and drive alignment across internal teams, contractors, vendors, and external partners.
  • Strong analytical, organizational, and problem-solving skills with the ability to operate independently as a senior individual contributor.

#LI-KC15

Qualifications

Disclaimer:

Certain U.S. based or U.S. customer or client-facing roles may be required to comply with applicable requirements, such as immunization/occupational health mandates, and/or drug testing requirements.

Range and benefit information provided in this posting are specific to the stated locations only

US: Hiring Range in USD from: $102,300 to $209,500 per annum. May be eligible for bonus and equity.

Oracle maintains broad salary ranges for its roles in order to account for variations in knowledge, skills, experience, market conditions and locations, as well as reflect Oracle's differing products, industries and lines of business. Candidates are typically placed into the range based on the preceding factors as well as internal peer equity.

Oracle US offers a comprehensive benefits package which includes the following: 1. Medical, dental, and vision insurance, including expert medical opinion 2. Short term disability and long term disability 3. Life insurance and AD&D 4. Supplemental life insurance (Employee/Spouse/Child) 5. Health care and dependent care Flexible Spending Accounts 6. Pre-tax commuter and parking benefits 7. 401(k) Savings and Investment Plan with company match 8. Paid time off: Flexible Vacation is provided to all eligible employees assigned to a salaried (non-overtime eligible) position. Accrued Vacation is provided to all other employees eligible for vacation benefits. For employees working at least 35 hours per week, the vacation accrual rate is 13 days annually for the first three years of employment and 18 days annually for subsequent years of employment. Vacation accrual is prorated for employees working between 20 and 34 hours per week. Employees working fewer than 20 hours per week are not eligible for vacation. 9. 11 paid holidays 10. Paid sick leave: 72 hours of paid sick leave upon date of hire. Refreshes each calendar year. Unused balance will carry over each year up to a maximum cap of 112 hours. 11. Paid parental leave 12. Adoption assistance 13. Employee Stock Purchase Plan 14. Financial planning and group legal 15. Voluntary benefits including auto, homeowner and pet insurance

The role will generally accept applications for at least three calendar days from the posting date or as long as the job remains posted. As part of Oracle's onboarding process and consistent with applicable law, US-based employees are required to complete identity verification, which involves the collection and processing of their biometric information. Accommodations to this requirement may be granted following an individualized assessment.

About Us

Only Oracle brings together the data, infrastructure, applications, and expertise to power everything from industry innovations to life-saving care. And with AI embedded across our products and services, we help customers turn that promise into a better future for all. Discover your potential at a company leading the way in AI and cloud solutions that impact billions of lives.

True innovation starts when everyone is empowered to contribute. That’s why we’re committed to growing a workforce that promotes opportunities for all with competitive benefits that support our people with flexible medical, life insurance, and retirement options. We also encourage employees to give back to their communities through our volunteer programs.

We’re committed to including people with disabilities at all stages of the employment process. If you require accessibility assistance or accommodation for a disability at any point, let us know by emailing [email protected] or by calling 1-888-404-2494 in the United States.

Oracle is an Equal Employment Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, sexual orientation, gender identity, disability and protected veterans’ status, or any other characteristic protected by law. Oracle will consider for employment qualified applicants with arrest and conviction records pursuant to applicable law.

From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against Oracle / OCI's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on Oracle / OCI's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    Oracle / OCI's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Nearby

Live postings like this one

Same employer first, then the same role elsewhere.

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.