Skip to content

Open nowPosted 13 days ago

QA/QC Manager [Data Center Construction]/ Upto $10K basic+VB/ 5days/ A1 Main Contractor/ East area

SEARCH INDEX PTE. LTD.

Pay
SGD 7,000 – SGD 10,000 a month
Where
Singapore
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowQA/QC Manager [Data Center Construction]/ Upto $10K basic+VB/ 5days/ A1 Main Contractor/ East areaSEARCH INDEX PTE. LTD. · Singapore
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on SEARCH INDEX PTE. LTD.'s own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

12.3% of postings close within 7 days. Measured by our own scanner across the market.

Share of postings closed within
  1. 2.1%1 day
  2. 4.5%3 days
  3. 12.3%7 days
  4. 19.3%14 days
  5. 35.6%30 days
  6. 58.1%60 days
This job: posted 13 days ago

The posting

  • Up to $10,000 Basic + Variable bonus
  • Permanent position, New Data Center project at East area
  • Experience in constructing Data Center projects preferred.
  • Familiar with data centre construction quality requirements, testing and commissioning procedures, and relevant standards including ISO 9001, ANSI/TIA-942, ASHRAE thermal guidelines, Uptime Institute Tier principles, ASTM, ANSI, ACI, Singapore Standards and applicable Codes of Practice will be advantageous.
  • Having ISO 9001 Auditor certification, TIA-942, Uptime Institute, commissioning, Green Mark or other relevant data centre certifications will be advantageous.
  • MNC & Leading A1 Main Contractor!

Job Responsibilities:

  1. Experience in constructing Data Center projects preferred.
  2. Familiar with data centre construction quality requirements, testing and commissioning procedures, and relevant standards including ISO 9001, ANSI/TIA-942, ASHRAE thermal guidelines, Uptime Institute Tier principles, ASTM, ANSI, ACI, Singapore Standards and applicable Codes of Practice will be advantageous.
  3. Having ISO 9001 Auditor certification, TIA-942, Uptime Institute, commissioning, Green Mark or other relevant data centre certifications will be advantageous.
  • Lead the project’s QA/QC programme and ensure all works meet contract, drawing and specification requirements.
  • Develop and maintain the Project Quality Plan, inspection checklists, quality procedures and reporting system.
  • Review construction documents, material submissions and inspection records for completeness and compliance.
  • Conduct and coordinate site inspections for civil, architectural and M&E works.
  • Ensure subcontractors understand quality requirements before starting work.
  • Monitor materials, equipment and workmanship delivered to site.
  • Manage defects, non-conformance reports, punch lists and corrective actions through closure.
  • Chair regular quality meetings and track outstanding issues.
  • Supervise QA/QC inspectors and verify that quality documentation is properly maintained.
  • Work closely with the project team, consultants, subcontractors and client representatives.
  • Identify quality risks early and implement preventive or corrective measures.
  • Drive continuous improvement throughout construction and handover.

Job Requirements:

  • Diploma/ Degree in Civil Engineering or other related discipline.

Other Information: Please submit your resume with the following details:

  • Reason for leaving each past & current employment
  • Salary drawn for each past & current employment
  • Expected Salary
  • Earliest availability date

We regret only shortlisted candidates will be notified.

Lionel Cheow

EA License | 14C7092

EA Registration Number | R1105005

Posting text belongs to the employer. Removal requests: contact us.

From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against SEARCH INDEX PTE. LTD.'s own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on SEARCH INDEX PTE. LTD.'s form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    SEARCH INDEX PTE. LTD.'s answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Nearby

Live postings like this one

Same employer first, then the same role elsewhere.

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.