Skip to content

Open nowPosted 69 days ago

MEP Specialist - Data Center Construction

Sundt76 open roles

Where
Lockhart, TX, United States
Work mode
On site
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowMEP Specialist - Data Center ConstructionSundt · Lockhart, TX, United States
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on Sundt's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

8.1% of postings close within 7 days. Measured by our own scanner across the market. Sundt postings stay open a median of 3 days.

Share of postings closed within
  1. 1.7%1 day
  2. 3.6%3 days
  3. 8.1%7 days
  4. 15.0%14 days
  5. 33.9%30 days
This job: posted 69 days ago

Sundt median: 3 days open

The posting

Job Description

Job Summary

MEP Specialist will lead the effort in coordinating the MEP trades on major construction projects. This candidate will work with the project team to ensure successful completion of all MEP trade work.

Key Responsibilities

1. Assist Schedulers and/or site personnel with developing detailed CPM schedules for all MEP installation activities, including cost and resource loading. 2. Assist in developing plans for the start?up of MEP systems and commissioning of project with the project team. 3. Conduct site visits to review the quality of subcontractor installation, noting deficiencies, and working with project team to resolve issues. Review subcontractor change order pricing when requested to assist project team. 4. Coordinate activities, materials procurement and other related activities with Project Manager and field staff and communicate progress and prepare appropriate reports as needed. 5. Facilitates the 3?D coordination process to resolve all conflicts prior to start of installations. 6. Interface directly with the assigned CxA and specifically manage all commissioning related documentation including pre-functional checklists, start-up checklists, and functional test documents. 7. Lead MEP subcontractors throughout duration of the project (from groundbreaking through commissioning and turnover to owner). 8. Provide warranty support and resolution plans to address open items. 9. Represent Sundt Construction in regard to the MEP process at weekly Owner and contractors meetings. 10. Review all MEP related submittals and confirm they are in compliance with the design criteria and contract. 11. Work with Superintendent on project logistics and temporary facility plans and review and approve material and equipment for MEP systems prior to installation.

Minimum Job Requirements

1. 3-6 years of experience (Step I) and 6-9 years of experience (Step II) in Construction/MEP Coordination. 2. Bachelor's degree in Construction Management or Engineering preferred. 3. Experienced dealing with MEP subcontracts and subcontractors. 4. General understanding of Building Codes, Mechanical Codes, Electrical Codes and Plumbing Codes as they relate to construction of project. 5. Good understanding of all mechanical, electrical, plumbing and low?voltage systems. 6. MEP Specialist Step I will ideally have 3 years of experience as a Project Engineer. 7. MEP Specialist Step II will ideally have a combined total of 6-9 years of Project Engineer and Superintendent experience and should have experience coordinating MEP systems on large scale projects. 8. MEP Specialist must have an in depth knowledge of LEED especially as it relates to the Fundamental and Enhanced commissioning credits. 9. Proficient use of all Microsoft Office Suite programs as well as Primavera P6.

Note: Job Description is subject to change at any time and may include other duties as assigned.

Physical Requirements

1. Ability to wear personal protective equipment is required (including but not limited to; steel toed shoes, gloves, safety glasses, hearing protection, hardhat, vest, etc.) 2. May reach above shoulder heights and below the waist on a frequent basis 3. May stoop, kneel, or bend, on an occasional basis 4. May use telephone, computer system, email, or other electronic devices on a limited basis to communicate with internal and external customers or vendors 5. Must be able to comply with all safety standards and procedures 6. Occasionally will climb stairs, ladders, etc. 7. Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis 8. Will interact with people frequently during a shift/work day 9. Will lift, push or pull objects on an occasional basis 10. Will sit, stand or walk short distances for up to the entire duration of a shift/work day.

Safety Level

Safety-Sensitive

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.

#LI-HW1

About Us

As a 100% employee-owned contractor, when you work at Sundt, you’re not just hiring on at a company, you’re joining a culture. Because everyone at Sundt is part owner, you’ll join a team of people who are deeply invested in their work. From apprentices to managers, we’re passionate about the details and deliberate in everything we do.

At Sundt we focus on building long-term prosperity for our clients, communities and employee-owners. We offer competitive pay, industry-leading benefits including a 401k and employee stock ownership plan, incentive programs for craft and administrative employees as well as training that focuses on your personal and professional growth. We’re driven by skill, grit and purpose. Join us as we strive to be the most skilled builder in America.

Equal Opportunity Employer Statement: Sundt is committed to the equal treatment of all employees, and/or applicants for employment, and prohibits discrimination based on race, religion, sex (including pregnancy), sexual orientation, gender identity, color, age, disability, national origin, covered veteran status, genetic information; or any other classification protected by applicable Federal, state, or local laws.

Benefit list:

  • Market Competitive Salary (paid weekly)
  • Bonus Eligibility based on company, group, and individual performance
  • Employee Stock Ownership Plan & 401K
  • Industry Leading Health Coverage Starting Your First Day
  • Flexible Time Off (FTO)
  • Medical, Health Savings, and Wellness credits
  • Flexible Spending Accounts
  • Employee Assistance Program
  • Workplace Wellness Programs
  • Mental Health Program
  • Life and Disability Insurance
  • Employee-Owner Perks
  • Educational Assistance
  • Sundt Foundation - Charitable Employee-Owner's program
From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against Sundt's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on Sundt's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    Sundt's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Nearby

Live postings like this one

Same employer first, then the same role elsewhere.

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.