Skip to content

Open nowFirst seen 3 days ago

Data Center Construction Site Project Manager

Vets Hired787 open roles

Where
Warrenton, Virginia, United States
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowData Center Construction Site Project ManagerVets Hired · Warrenton, Virginia, United States
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on Vets Hired's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

12.3% of postings close within 7 days. Measured by our own scanner across the market.

Share of postings closed within
  1. 2.1%1 day
  2. 4.5%3 days
  3. 12.3%7 days
  4. 19.3%14 days
  5. 35.6%30 days
  6. 57.8%60 days
This job: first seen 3 days ago

The posting

Job Summary

The Data Center Construction Site Manager oversees the engineering, design, and construction of new production facilities or the modification of existing sites. This role involves anticipating, planning, and coordinating ongoing and future construction requirements. The manager is responsible for technical, logistical, and safety requirements during both pre-construction and construction phases.

Essential Duties & Responsibilities

  • Project Procurement: Lead the bidding process, vendor evaluation/selection, and contract negotiations.
  • Compliance & Permitting: Obtain necessary permits, arrange inspections, and ensure all activities meet internal specifications and external regulations.
  • Project Controls: Develop and maintain construction schedules and budgets; provide daily, weekly, and monthly status reports.
  • Vendor Management: Coordinate contractors and subcontractors; manage daily vendor performance and adherence to quality and health/safety standards.
  • Design & Strategy: Lead the development of scheme designs and construction methodologies. Collaborate on general schematics for electrical distribution, cooling, network cabling, and fit-outs.
  • Logistics: Supervise and optimize the reception and storage of material and equipment on-site.
  • Quality Assurance: Manage site project quality control, ensure design amendments are completed, and resolve technical non-conformities.

Minimum Requirements

  • Experience: 8+ years of experience in construction site management with multi-technical site experience.
  • Education: Bachelor's degree in engineering (or a related field) or equivalent applicable experience.
  • Technical Expertise: Proficiency in one or more of the following: structural, mechanical, cooling, electrical, or BMS (Building Management Systems).
  • Certifications: Electrical certification(s) are preferred.
  • Skills: * Strong ability to collaborate in a team environment. Excellent communication, organizational skills, and attention to detail.
From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against Vets Hired's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on Vets Hired's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    Vets Hired's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Nearby

Live postings like this one

Same employer first, then the same role elsewhere.

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.