Skip to content

Open nowPosted 5 days ago

Site Logistics Project Manager, Vernon, TX - Data Center Construction

World Wide Professional Solutions45 open roles

Where
Vernon, TX
Work mode
On site
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowSite Logistics Project Manager, Vernon, TX - Data Center ConstructionWorld Wide Professional Solutions · Vernon, TX
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on World Wide Professional Solutions's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

14.3% of postings close within 7 days. Measured by our own scanner across the market. World Wide Professional Solutions postings stay open a median of 63 days.

Share of postings closed within
  1. 2.2%1 day
  2. 4.7%3 days
  3. 14.3%7 days
  4. 22.9%14 days
  5. 39.1%30 days
  6. 59.3%60 days
This job: posted 5 days ago

World Wide Professional Solutions median: 63 days open

The posting

WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization committed to implementing lean constructions, collaborative contracting, and execution approaches to enable breakthroughs in performance.

WWPS is hiring a Site Logistics Project Manager to support a large-scale data center construction project in Vernon, Texas. This is a full-time, 100% onsite role based in Vernon, Texas.

This role will lead project site logistics for a major mission critical construction program. You will be responsible for planning, coordinating, and managing the physical flow of people, materials, equipment, temporary facilities, laydown areas, access routes, and site support infrastructure needed to keep a complex construction site moving safely and efficiently.

This is a high visibility owner’s rep role where you will act as an extension of the owner’s team, partnering closely with construction leadership, trade contractors, site operations, safety, quality, and project controls. You will have real ownership over site logistics strategy, not just coordination responsibility.

Wherever you are based, we provide full relocation or travel support including per diem, ensuring a smooth transition so you can hit the ground running from day one.

What Makes This Role Different

  • Owner’s rep position with direct influence on site execution
  • Large-scale, mission critical data center build with complex site logistics
  • Leadership role focused on keeping the entire project site organized, safe, and productive
  • Direct responsibility for laydown planning, access control, temporary facilities, and site infrastructure
  • Fast-paced environment with real decision-making authority
  • Full lifecycle exposure from early site planning through construction, commissioning, and turnover

What You Will Do

  • Lead site logistics planning and execution for a large-scale data center construction project
  • Manage complex project site material laydown areas, storage areas, staging plans, and site access routes
  • Coordinate road improvements, haul routes, traffic flow, delivery sequencing, parking, and construction access needs
  • Oversee temporary site facilities including trade lunch tents, workforce support areas, field offices, logistics zones, and related site infrastructure
  • Coordinate logistics planning for concrete batch plants, heavy equipment movement, crane access, trucking, material deliveries, and high-volume construction activities
  • Act as the primary logistics interface across owners, general contractors, trade partners, vendors, and project stakeholders
  • Develop and maintain site logistics plans that support safety, schedule, productivity, and constructability
  • Monitor site conditions and proactively resolve congestion, storage, sequencing, access, and coordination issues
  • Partner with safety teams to ensure logistics activities support safe movement of people, materials, vehicles, and equipment
  • Work closely with project controls and construction teams to align logistics planning with schedule milestones and construction sequencing
  • Lead coordination meetings related to logistics, deliveries, site access, laydown, temporary facilities, and site constraints
  • Support change management by identifying logistics impacts related to scope changes, schedule shifts, weather, workforce growth, or trade stacking
  • Enforce site standards for housekeeping, material storage, access control, signage, traffic management, and logistics compliance
  • Lead and mentor project team members and trade partners supporting logistics execution

What You Bring

  • 3-5+ years of construction project management, logistics management, site operations, or field leadership experience
  • Strong experience managing logistics on large-scale construction sites
  • Background in data centers, mission critical, industrial, manufacturing, infrastructure, semiconductor, or other complex construction environments
  • Proven ability to lead site logistics across multiple contractors, trades, vendors, and stakeholders
  • Experience managing material laydown areas, storage yards, staging plans, delivery routes, temporary facilities, and site access plans
  • Experience coordinating road improvements, haul routes, concrete batch plants, workforce support areas, parking, and site infrastructure is strongly preferred
  • Strong understanding of construction sequencing, site constraints, field operations, safety requirements, and schedule impacts
  • Ability to identify problems early and drive practical field solutions
  • Strong leadership, communication, and stakeholder management skills
  • Proficiency with Procore, Bluebeam, Primavera P6, MS Project, or similar construction management tools

Preferred Background

  • Data center or mission critical construction experience strongly preferred
  • Experience on projects exceeding $250M preferred
  • Experience supporting owner’s rep, construction management, EPC, general contractor, or large trade contractor teams
  • Bachelor’s degree in construction management, engineering, logistics, supply chain, or related field preferred
  • OSHA, PMP, LEED, or similar certifications are a plus

Compensation and Benefits

  • Highly competitive compensation aligned with senior-level project leadership roles
  • Per diem and travel support where applicable
  • Medical, dental, and vision coverage
  • Life insurance and disability coverage
  • Company-matched retirement plan
  • Paid time off and paid holidays

Why Top Candidates Choose WWPS

  • Work on complex, high-impact projects in rapidly growing sectors
  • Operate in a true owner’s rep capacity with influence and visibility
  • Lead the logistics strategy that keeps a major construction site moving
  • Be part of a team focused on execution, not bureaucracy
  • Grow alongside major infrastructure and technology expansion across the U.S.
  • Join a company that is scaling and investing in top talent

Bottom Line

If you are a construction logistics leader who knows how to organize complex project sites, manage laydown and storage strategies, coordinate temporary facilities, solve access challenges, and lead field execution on large-scale builds, this is a strong opportunity to step into a high-impact owner’s rep role on a major data center construction project.

This is a full-time position for World Wide Professional Solutions. We offer excellent benefits including medical, dental, vision, life, short term disability, long term disability, and a company match retirement plan. All benefits begin the first of the month following your start date.

World Wide Professional Solutions provides equal employment opportunities to all employees and applicants for employment and prohibits discrimination and harassment of any type without regard to race, color, religion, age, sex, national origin, disability status, genetics, protected veteran status, sexual orientation, gender identity or expression, or any other characteristic protected by federal, state or local laws.

From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against World Wide Professional Solutions's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on World Wide Professional Solutions's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    World Wide Professional Solutions's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.