The posting
The Contractor is required to carry out inspection ofJTC properties including returned properties and all follow-up actions tomonitor and report compliance with requirements provided by JTC and that thepremises do not infringe authorities’ requirements, including but not limitedto:
a)Non-complianceto statutory requirements, e.g.
-Unapproved building works and any additions/alterations,
- FireSafety Hazards,
-Unapproved usage or change of usage of premises,
-Illegal activities in premises e.g. illegal dumping, gambling, etc,
-Unapproved worker’s dormitory;
-Unapproved sales of diesel;
b)Unapproved subletting;
c)Encroachment;
d)Poor Maintenance/Housekeeping; and
e)Unauthorised reclamation.
The Works also include verification of gross floorarea (GFA) and monitoring the reinstatement works of the return properties toJTC’s satisfaction.
The works of the Contractor shall include
Make arrangement with companies and carry outinspection of their premises;
Identify issues and raise concerns relating tonon-compliance with statutory and JTC requirements; and
Follow up with reinstatement works for returnproperties and rectification of breaches for all properties.
Inspection Reports :
Submit inspection reports including photos to JTC onthe findings (“Inspection Report”) and send breach letters to company ifnon-compliances or irregularities are detected;
Inspection Reports shall be submitted and uploaded inJTC’s system within 5 working days from the date of inspection. The inspectionreports shall be in the format specified by JTC and shall consist of findingswith photographs taken of the premises and breaches identified during theinspection; and
Notify JTC on critical non-compliance issues resultingfrom infringement of statutory requirements and impact on public safety within24 hours from inspection (email with photographs/pictures).



