Skip to content

Open nowPosted 87 days ago

Electrical Field Superintendent - Data Center Construction

Experienced Professionals199 open roles

Where
Temple, TX, United States
Work mode
On site
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowElectrical Field Superintendent - Data Center ConstructionExperienced Professionals · Temple, TX, United States
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on Experienced Professionals's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

8.2% of postings close within 7 days. Measured by our own scanner across the market. Experienced Professionals postings stay open a median of 3 days.

Share of postings closed within
  1. 1.8%1 day
  2. 3.6%3 days
  3. 8.2%7 days
  4. 15.2%14 days
  5. 34.0%30 days
This job: posted 87 days ago

Experienced Professionals median: 3 days open

The posting

Job Description

As a 100% employee-owned contractor, when you work at Sundt, you’re not just hiring on at a company, you’re joining a culture. Because everyone at Sundt is part owner, you’ll join a team of people who are deeply invested in their work. From apprentices to managers, we’re passionate about the details and deliberate in everything we do.

At Sundt we focus on building long-term prosperity for our clients, communities, and employee-owners. We offer competitive pay, industry-leading benefits including a 401k and employee stock ownership plan, incentive programs for craft and administrative employees as well as training that focuses on your personal and professional growth. We’re driven by skill, grit and purpose. Join us as we strive to be the most skilled builder in America.

Job Summary

Manages day-to-day construction activities, including supervision of craft employees and subcontractors. Schedules field activities in coordination with the project schedule. Is responsible for safety, production goals, quality control, and cost control. May supervise one or more craft groups and/or scopes of work. This position includes three 'steps' (I, II and Sr.), which provide for a progression of skill and experience. Step I is the entry level for individuals with a minimum of experience in this position and the ability to manage 1-2 crews and/or foremen, and subcontractors.

Key Responsibilities:

1. Assists in or conducts review of shop drawings and design conflicts along with RFI review and implementation and manages Quality Control and Safety responsibilities as well as subcontractor coordination and oversight. Ensures the quality management plan is followed and verifies the quality of work being installed meets and/or exceeds Sundt' s expectations. 2. Assists in or manages the selection of equipment, construction methods, and sequencing of operations. 3. Assists with or conducts subcontractor meetings. 4. Assists with or manages the implementation of LEAN planning. 5. Conducts risk management analysis on a daily basis working with project leaders to ensure timely mitigation and documentation. 6. Demonstrates competency in understanding the environmental control processes for the project and takes corrective action when necessary. 7. Emphasizes a culture of safety throughout the project and ensures the safety plan is executed relentlessly. (This should be the first Key Responsibility) 8. Enforces the project management plan (PMP) to ensure the activities in the field are consistent with the plans policies and procedures. 9. Ensures project control activities and costs are managed daily and that appropriate actions are taken to ensure consistent deliverables and a successful project execution. Demonstrates business acumen within area of responsibility. Has an understanding of the change management process. 10. On self-perform projects this position may acquire, develops and manages craft field team, including: establishing and communicating performance expectations, providing positive and constructive feedback, determining training and development needs, and conducting on-the-job training to ensure relentless execution of the project. May conduct Individual Development Reviews. 11. Oversees, directs, and coordinates manpower, equipment, material, and subcontract activities in accordance with the project schedule. Ensures the material management plan is followed as well as any change control processes required to administer contract processes required to administer contracts or purchase orders. 12. Participate in business development and preconstruction activities as directed. 13. Prepares and maintains a detailed schedule for specific areas of responsibility. Ensure scheduling, sequencing of activities and all changes are incorporated, developed, controlled, managed and communicated daily to the project team and actions are taken to ensure timely execution. 14. Reviews the following for proper preparation and coding: Time Sheets, Quantity reporting, and daily costs. Completes all daily reporting requirements in a timely and accurate manner, consistent with the Sundt Management System (SMS). 15. Uses available reports to manage project scope and ensure the appropriate steps are taken to build the project successfully in the field. Understands and may participate in the development of the Monthly Progress Report.

Minimum Job Requirements:

1. Excellent written and verbal communication skills. 2. Minimum of two years supervisory experience in similar construction technology, methods, equipment, tools, and work procedures required. 3. Understanding construction scheduling and cost control and the ability to control and supervise employees and subcontractors is essential.

Note: Job Description is subject to change at any time and may include other duties as assigned.

Physical Requirements:

1. Ability to wear personal protective equipment is required (including but not limited to; steel toed shoes, gloves, safety glasses, hearing protection, hardhat, vest, etc.) 2. May reach above shoulder heights and below the waist on a frequent basis 3. May stoop, kneel, or bend, on an occasional basis 4. May use telephone, computer system, email, or other electronic devices on a limited basis to communicate with internal and external customers or vendors 5. Must be able to comply with all safety standards and procedures 6. Occasionally will climb stairs, ladders, etc. 7. Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis 8. Will interact with people frequently during a shift/workday 9. Will lift, push or pull objects on an occasional basis 10. Will sit, stand or walk short distances for up to the entire duration of a shift/workday.

Equal Opportunity Employer Statement: Sundt is committed to the equal treatment of all employees, and/or applicants for employment, and prohibits discrimination based on race, religion, sex (including pregnancy), sexual orientation, gender identity, color, age, disability, national origin, covered veteran status, genetic information; or any other classification protected by applicable Federal, state, or local laws.

Benefit list: Market Competitive Salary (paid weekly) Bonus Eligibility based on company, group, and individual performance Employee Stock Ownership Plan & 401K Industry Leading Health Coverage Starting Your First Day Flexible Time Off (FTO) Medical, Health Savings, and Wellness credits Flexible Spending Accounts Employee Assistance Program Workplace Wellness Programs Mental Health Program Life and Disability Insurance Employee-Owner Perks Educational Assistance Sundt Foundation - Charitable Employee-Owner's program

About Us

As a 100% employee-owned contractor, when you work at Sundt, you’re not just hiring on at a company, you’re joining a culture. Because everyone at Sundt is part owner, you’ll join a team of people who are deeply invested in their work. From apprentices to managers, we’re passionate about the details and deliberate in everything we do.

At Sundt we focus on building long-term prosperity for our clients, communities and employee-owners. We offer competitive pay, industry-leading benefits including a 401k and employee stock ownership plan, incentive programs for craft and administrative employees as well as training that focuses on your personal and professional growth. We’re driven by skill, grit and purpose. Join us as we strive to be the most skilled builder in America.

Equal Opportunity Employer Statement: Sundt is committed to the equal treatment of all employees, and/or applicants for employment, and prohibits discrimination based on race, religion, sex (including pregnancy), sexual orientation, gender identity, color, age, disability, national origin, covered veteran status, genetic information; or any other classification protected by applicable Federal, state, or local laws.

Benefit list:

  • Market Competitive Salary (paid weekly)
  • Bonus Eligibility based on company, group, and individual performance
  • Employee Stock Ownership Plan & 401K
  • Industry Leading Health Coverage Starting Your First Day
  • Flexible Time Off (FTO)
  • Medical, Health Savings, and Wellness credits
  • Flexible Spending Accounts
  • Employee Assistance Program
  • Workplace Wellness Programs
  • Mental Health Program
  • Life and Disability Insurance
  • Employee-Owner Perks
  • Educational Assistance
  • Sundt Foundation - Charitable Employee-Owner's program
From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against Experienced Professionals's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on Experienced Professionals's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    Experienced Professionals's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Nearby

Live postings like this one

Same employer first, then the same role elsewhere.

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.