Skip to content

Open nowPosted 87 days ago

Field Engineer - Data Center Construction

Experienced Professionals199 open roles

Where
Temple, TX, United States
Work mode
On site
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowField Engineer - Data Center ConstructionExperienced Professionals · Temple, TX, United States
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on Experienced Professionals's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

8.2% of postings close within 7 days. Measured by our own scanner across the market. Experienced Professionals postings stay open a median of 3 days.

Share of postings closed within
  1. 1.8%1 day
  2. 3.6%3 days
  3. 8.2%7 days
  4. 15.2%14 days
  5. 34.0%30 days
This job: posted 87 days ago

Experienced Professionals median: 3 days open

The posting

Job Description

Job Summary

Assists the Project Engineer with being the technical source of information for the project. Responds to questions about drawings, specifications, shop drawings, and change orders and have responsibility for assisting in writing change orders, RFl's, meeting minutes, and reviewing Submittals. Maintains an effective and professional working relationship with owners, architects, engineers, subcontractors, and suppliers. This position includes three 'steps' (I, II and Senior), which provide for a progression of skill and experience. Step I is the entry level for individuals with a minimum of experience in this position.

Key Responsibilities

1. Assists Project Engineer in developing and maintaining as-built drawings and other work tasks and assists with or reviews and processes submittals, change orders, RFl's, and budget forecasting. Ensures the timely and appropriate generation, collection, distribution, storage, retrieval and ultimate disposition of meeting agendas, RFl's and daily reports. 2. Demonstrates an understanding of the project management plan (PMP) and is involved in support and execution of the plan. Demonstrates a thorough understanding of the change management process and performs project scope activities and supports the project team to ensure the work needed to complete the project successfully. 3. Ensures the administration of the project quality management plan and demonstrates and reinforces a culture of safety throughout the project. 4. May assist in the calculation of daily production rates and unit costs for self-performed work. Participates in risk management including identification, analysis, response planning and monitoring and control on a project and demonstrates competency in understanding the environmental control processes for the project and takes corrective actions when necessary. 5. May be responsible for overseeing/managing the BIM (Building Information Modeling) Coordination between Subcontractors and Designers. 6. May be responsible for the documentation and submittal for the LEED (Leadership in Energy and Environmental Design) Certification of a building and for creating and updating Digital Record Drawings (ORD). 7. May provide lines, grades and layout as required for the project while maintaining an organized logbook. 8. May provide the following weekly quantities: maintains accurate quantity logs and reports quantities in compliance with the cost control manual. Completed logs are to be filed with the project files. Perform elements of the processes involved in budgeting and controlling costs so that the project can be completed within the approved budget. Demonstrates business acumen within area of responsibility. (Not all Field Engineers track quantities) 9. Provides support to superintendents required for the execution of the work and assists in the resolution of field problems as necessary.

Minimum Job Requirements

1. Ability to assume responsibility, interface and communicate with others is essential. 2. Entry-level position that normally requires a four-year construction-related degree or equivalent technical/field experience. 3. Microsoft Office Suite (Outlook, Word, Excel, PowerPoint, etc.) proficiency.

Note: Job Description is subject to change at any time and may include other duties as assigned.

Physical Requirements

1. Ability to wear personal protective equipment is required (including but not limited to; steel toed shoes, gloves, safety glasses, hearing protection, hardhat, vest, etc.) 2. May reach above shoulder heights and below the waist on a frequent basis 3. May stoop, kneel, or bend, on an occasional basis 4. May use telephone, computer system, email, or other electronic devices on a limited basis to communicate with internal and external customers or vendors 5. Must be able to comply with all safety standards and procedures 6. Occasionally will climb stairs, ladders, etc. 7. Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis 8. Will interact with people frequently during a shift/workday 9. Will lift, push or pull objects on an occasional basis 10. Will sit, stand or walk short distances for up to the entire duration of a shift/workday.

Safety Level

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.

About Us

As a 100% employee-owned contractor, when you work at Sundt, you’re not just hiring on at a company, you’re joining a culture. Because everyone at Sundt is part owner, you’ll join a team of people who are deeply invested in their work. From apprentices to managers, we’re passionate about the details and deliberate in everything we do.

At Sundt we focus on building long-term prosperity for our clients, communities and employee-owners. We offer competitive pay, industry-leading benefits including a 401k and employee stock ownership plan, incentive programs for craft and administrative employees as well as training that focuses on your personal and professional growth. We’re driven by skill, grit and purpose. Join us as we strive to be the most skilled builder in America.

Equal Opportunity Employer Statement: Sundt is committed to the equal treatment of all employees, and/or applicants for employment, and prohibits discrimination based on race, religion, sex (including pregnancy), sexual orientation, gender identity, color, age, disability, national origin, covered veteran status, genetic information; or any other classification protected by applicable Federal, state, or local laws.

Benefit list:

  • Market Competitive Salary (paid weekly)
  • Bonus Eligibility based on company, group, and individual performance
  • Employee Stock Ownership Plan & 401K
  • Industry Leading Health Coverage Starting Your First Day
  • Flexible Time Off (FTO)
  • Medical, Health Savings, and Wellness credits
  • Flexible Spending Accounts
  • Employee Assistance Program
  • Workplace Wellness Programs
  • Mental Health Program
  • Life and Disability Insurance
  • Employee-Owner Perks
  • Educational Assistance
  • Sundt Foundation - Charitable Employee-Owner's program
From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against Experienced Professionals's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on Experienced Professionals's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    Experienced Professionals's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Nearby

Live postings like this one

Same employer first, then the same role elsewhere.

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.