Skip to content

Open nowPosted 87 days ago

Sr Project Superintendent - Data Center Construction

Experienced Professionals199 open roles

Where
Temple, TX, United States
Work mode
On site
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowSr Project Superintendent - Data Center ConstructionExperienced Professionals · Temple, TX, United States
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on Experienced Professionals's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

8.2% of postings close within 7 days. Measured by our own scanner across the market. Experienced Professionals postings stay open a median of 3 days.

Share of postings closed within
  1. 1.8%1 day
  2. 3.6%3 days
  3. 8.2%7 days
  4. 15.2%14 days
  5. 34.0%30 days
This job: posted 87 days ago

Experienced Professionals median: 3 days open

The posting

Job Description

Job Summary

The Project Superintendent (PS) will plan, coordinate, and supervise the field and/or administrative operations of projects. They will provide technical direction and have responsibility for the safety, costs, productivity, profitability, and overall quality of the work (including self-performed work) for the project(s). The PS will establish productivity goals and measure performance as well as schedule labor, materials, and equipment, including the work of subcontractors and may supervise one or more field superintendents. This position includes 'steps', which provide for a progression of skill and experience. - Sr. Project Superintendent I is capable of fairly large projects of $51-$100 million in size with typically 10-15 years' experience. - Sr. Project Superintendent II is capable of larger projects of a complex nature and/or multiple projects totaling $100-$199 million and typically with a minimum of 15 years' of experience.

Key Responsibilities

1. Assists in the review of shop drawings, submittals, subcontract change orders and purchase orders. 2. Conducts weekly coordination meetings with project teams and subcontractors and prepares daily field status reports. 3. Coordinates the documentation of design conflicts and clarifications with the appropriate personnel. 4. Develops and manages the construction plan for the successful execution of the work performed. 5. Ensures work is executed according to contract terms and conditions in a profitable manner. 6. Interacts effectively with owners, teams and other stakeholders to maintain a positive project environment and exceptional client experience. 7. Prepares and updates the original CPM Project Schedule and ensures the schedule is kept current to manage the project appropriately while utilizing LEAN processes and Weekly Work Plans. 8. Provides leadership and guidance to assigned project team members and subcontractors. 9. Responsible for project success, including profitability, safety, schedule, quality and customer satisfaction. 10. Responsible for the development and implementation of the Project Quality Management and Safety plans according to Sundt standards. 11. Responsible for the timely completion of all punch lists and develops a schedule as required by the owner for the successful start-up and commissioning of all systems.

Minimum Job Requirements

1. Excellent communication, organizational, and supervisory skills are essential. 2. Four-year engineering degree or equivalent combinations of technical training and/or related experience required. 3. Must have a thorough knowledge of all aspects of construction (technology, equipment, and methods), negotiations, engineering, cost control, scheduling, and safety. 4. Must have construction project and supervision experience in similar types of facilities.

Note: Job Description is subject to change at any time and may include other duties as assigned.

Physical Requirements

1. Ability to wear personal protective equipment is required (including but not limited to; steel toed shoes, gloves, safety glasses, hearing protection, hardhat, vest, etc.) 2. May reach above shoulder heights and below the waist on a frequent basis 3. May stoop, kneel, or bend, on an occasional basis 4. May use telephone, computer system, email, or other electronic devices on a limited basis to communicate with internal and external customers or vendors 5. Must be able to comply with all safety standards and procedures 6. Occasionally will climb stairs, ladders, etc. 7. Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis 8. Will interact with people frequently during a shift/work day 9. Will lift, push or pull objects on an occasional basis 10. Will sit, stand or walk short distances for up to the entire duration of a shift/work day.

Safety Level

Safety-Sensitive

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.

About Us

As a 100% employee-owned contractor, when you work at Sundt, you’re not just hiring on at a company, you’re joining a culture. Because everyone at Sundt is part owner, you’ll join a team of people who are deeply invested in their work. From apprentices to managers, we’re passionate about the details and deliberate in everything we do.

At Sundt we focus on building long-term prosperity for our clients, communities and employee-owners. We offer competitive pay, industry-leading benefits including a 401k and employee stock ownership plan, incentive programs for craft and administrative employees as well as training that focuses on your personal and professional growth. We’re driven by skill, grit and purpose. Join us as we strive to be the most skilled builder in America.

Equal Opportunity Employer Statement: Sundt is committed to the equal treatment of all employees, and/or applicants for employment, and prohibits discrimination based on race, religion, sex (including pregnancy), sexual orientation, gender identity, color, age, disability, national origin, covered veteran status, genetic information; or any other classification protected by applicable Federal, state, or local laws.

Benefit list:

  • Market Competitive Salary (paid weekly)
  • Bonus Eligibility based on company, group, and individual performance
  • Employee Stock Ownership Plan & 401K
  • Industry Leading Health Coverage Starting Your First Day
  • Flexible Time Off (FTO)
  • Medical, Health Savings, and Wellness credits
  • Flexible Spending Accounts
  • Employee Assistance Program
  • Workplace Wellness Programs
  • Mental Health Program
  • Life and Disability Insurance
  • Employee-Owner Perks
  • Educational Assistance
  • Sundt Foundation - Charitable Employee-Owner's program
From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against Experienced Professionals's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on Experienced Professionals's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    Experienced Professionals's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Nearby

Live postings like this one

Same employer first, then the same role elsewhere.

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.