Skip to content

Open nowPosted 3 days ago

Substation Project Manager (Owners Representative) - Data Center Construction

KALCON49 open roles

Pay
$140,000 – $200,000 a year
Where
Houston, TX
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowSubstation Project Manager (Owners Representative) - Data Center ConstructionKALCON · Houston, TX
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on KALCON's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

8.2% of postings close within 7 days. Measured by our own scanner across the market. KALCON postings stay open a median of 7 days.

Share of postings closed within
  1. 1.8%1 day
  2. 3.6%3 days
  3. 8.2%7 days
  4. 15.2%14 days
  5. 34.0%30 days
This job: posted 3 days ago

KALCON median: 7 days open

The posting

The Substation Project Manager serves as the Owner's Representative responsible for the planning, execution, and delivery of high-voltage substation, utility interconnection, and transmission infrastructure projects supporting mission-critical data center developments. This role provides leadership across all phases of project delivery, including design coordination, procurement, construction, testing, commissioning, energization, and turnover. The Substation Project Manager is responsible for managing project scope, schedule, budget, quality, and risk while coordinating activities among contractors, utility providers, engineers, vendors, commissioning teams, and client stakeholders. The ideal candidate combines strong project management capabilities with a technical understanding of high-voltage electrical systems and the ability to drive accountability, resolve issues, and successfully deliver critical project milestones.

Minimum Qualifications:

  • Bachelor's degree in Electrical Engineering, Construction Management, Engineering, Project Management, or a related technical discipline, or equivalent relevant experience
  • 7-10+ years of experience managing and delivering high-voltage substation, transmission, utility, power generation, industrial, mission-critical, or data center infrastructure projects
  • Demonstrated experience serving in a Project Manager, Owner's Representative, Construction Manager, EPC, or utility project leadership role
  • Strong understanding of high-voltage power systems, including substations, switchyards, utility interconnections, and transmission infrastructure
  • stakeholder communications
  • Familiarity with substation equipment including transformers, circuit breakers, protection relays, switchgear, buswork, and transmission line components
  • Working knowledge of applicable industry standards and codes including IEEE, ANSI, NESC, NFPA, and OSHA
  • Ability to read, interpret, and review engineering drawings, specifications, schedules, and electrical schematics
  • Strong leadership, problem-solving, negotiation, and communication skills
  • Experience working in active construction and commissioning environments
  • Proficiency with Microsoft Office and project management software; Primavera P6 experience preferred
  • PMP, CCM, PE, or similar professional certification preferred

Duties and Responsibilities:

  • Serve as the Owner's Representative overseeing the successful planning, execution, and delivery of high-voltage substation and utility infrastructure projects supporting data center developments
  • Manage project scope, schedule, budget, quality, safety, and risk throughout the project lifecycle
  • Lead coordination efforts among utility providers, design consultants, contractors, commissioning teams, vendors, and client stakeholders
  • Monitor project progress against established milestones and develop mitigation strategies to address schedule or budget impacts
  • Facilitate project meetings and provide executive-level reporting on project status, risks, procurement activities, construction progress, commissioning readiness, and key project metrics
  • Review contractor schedules and support validation of critical path activities, construction sequencing, and recovery plans
  • Oversee contractor performance and hold project teams accountable to contractual obligations, project milestones, and quality expectations
  • Coordinate utility interconnection activities, outage planning, permitting requirements, energization milestones, and regulatory compliance efforts
  • Review and validate engineering drawings, technical specifications, RFIs, submittals, change orders, and design modifications for compliance with project requirements and design intent
  • Support procurement efforts by coordinating long-lead equipment activities, vendor deliverables, factory testing, and equipment delivery schedules
  • Perform regular site visits to monitor construction progress, verify installation quality, identify risks, and ensure adherence to safety and environmental standards
  • Support testing, commissioning, energization, startup, and turnover activities for high-voltage electrical systems
  • Identify project risks and develop mitigation plans to minimize impacts to project objectives
  • Maintain accurate project documentation including meeting minutes, action logs, schedules, budgets, risk registers, RFIs, change orders, and project reports
  • Provide leadership in resolving technical, commercial, and construction-related issues in collaboration with project stakeholders
  • Support operational readiness and project turnover activities to ensure successful transition from construction to operations

Benefits Offered:

  • Medical insurance
  • Dental Insurance
  • Vision Insurance
  • Life Insurance
  • Accident Insurance
  • Long Term Disability
  • 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
  • 15 days of paid time off
  • 8 paid National Holidays
  • Reimbursement for professional licenses and certifications

Submission Requirements:

At a minimum, the candidate’s professional resume must include the following:

  • List of all Educational Achievements
  • List of all Professional Licenses or Certificates
  • List of Awards Received
  • Detailed Employment History with each company including: Name & Contact Information of the firm or agency Start Date and End Date (Month & Year) Positions Held

At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicant and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.

Salary Range

$140,000—$200,000 USD

From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against KALCON's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on KALCON's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    KALCON's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.