Skip to content

Open nowPosted 15 days ago

Safety Coordinator [Data Centre Construction]/ 5 day/ $5.5k basic+bonus/ A1 Main Contractor/ East area

MyCareersFuture94,028 open roles

Pay
SGD 3,500 – SGD 5,500 a month
Where
Singapore
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowSafety Coordinator [Data Centre Construction]/ 5 day/ $5.5k basic+bonus/ A1 Main Contractor/ East areaMyCareersFuture · Singapore
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on MyCareersFuture's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

7.8% of postings close within 7 days. Measured by our own scanner across the market.

Share of postings closed within
  1. 1.6%1 day
  2. 3.4%3 days
  3. 7.8%7 days
  4. 14.3%14 days
  5. 33.7%30 days
This job: posted 15 days ago

The posting

  • Up to $5,500 basic + Bonus.
  • Participate in a Data Centre project in the East area.
  • Having WSQ Advanced Certificate in Workplace Safety and Health is mandatory.
  • Having experience in the design and construction of ata Centres is preferred.

Our client is a reputable MNC and leading A1 Main Contractor specialised in construction projects

Job Responsibilities:

  • Assist the Safety Officer in managing workplace safety, health & environmental matters
  • Conduct site safety inspections and assessments.
  • Ensure all day-to-day construction site activities comply with safety regulations
  • Conduct incident investigations and corrective actions.
  • Maintain all safety records.

Job Requirements

  • Possessing WSQ Advanced Certificate in Workplace Safety and Health is mandatory.
  • Having experience in the design and construction of Data Centres is preferred.

Other Information:

To apply please click on APPLY NOW to submit your resume with the following details:

  • Reason for leaving each past & current employment
  • Salary drawn for each past & current employment
  • Expected Salary
  • Earliest availability date

We regret only shortlisted candidates will be notified.

Lionel Cheow

EA License | 14C7092

EA Registration Number | R1105005

From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against MyCareersFuture's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on MyCareersFuture's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    MyCareersFuture's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.