Skip to content

Open nowPosted 242 days ago

Commercial Construction Scheduler/Planner [1411]

Skyelia66 open roles

Where
Houston, TX
Work mode
On site
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowCommercial Construction Scheduler/Planner [1411]Skyelia · Houston, TX
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on Skyelia's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

12.3% of postings close within 7 days. Measured by our own scanner across the market.

Share of postings closed within
  1. 2.1%1 day
  2. 4.5%3 days
  3. 12.3%7 days
  4. 19.3%14 days
  5. 35.6%30 days
  6. 57.8%60 days
This job: posted 242 days ago

The posting

About:

  • Location: Houston, TX
  • Full-time position

The Role:

Sodexo Energy and Resource is seeking a Commercial Construction Scheduler/Planner to work with one of Sodexo’s construction management/project controls teams at one of our largest energy accounts in Houston, TX. The Commercial Construction Scheduler/Planner will be supporting projects in Houston and numerous other sites. Sodexo provides our corporate service partners with a diverse range of food services and integrated facilities management possibilities. From restaurants to delivery options, to streamlined operations and cutting-edge technology, Sodexo creates a safe, vibrant, and eco-friendly workplace.

What You'll Do:

  • Create and update assigned schedules on a weekly basis and prepare schedule analyses/status reports monthly for internal and external customer management reviews.
  • Support the resolution and mitigation of schedule risks that may jeopardize on-time delivery by direct interaction with assigned Project personnel and department managers/supervisors.
  • Formulate and recommend methods, processes, and procedures that will improve the accuracy and timeliness of Project Schedules.
  • Provide recommendations for enhancements to Scheduling tools available for project execution and reporting.
  • Apply scheduling logic, schedule baseline management, critical path analysis, predecessor and successor relationships, constraint types, slack time, percent complete methods, and schedule resource loading methodologies as needed.
  • Generate and maintain detailed Project schedules and/or Integrated Master Schedules based on tasks defined by the work package.

What You Bring:

  • Formal training in Project Scheduling techniques and associated software
  • Understanding of Project Management control tools and systems and practices
  • MS Project Experience
  • Schedule/Cost reporting skills and techniques
  • Minimum of 4 years of direct project control experience with Primavera P6
  • Demonstrated prominent level of verbal and written communication skills
  • The ability to work in a challenging environment and manage multiple priorities
  • Advanced working knowledge of project scheduling and documentation techniques and processes
  • Strong Personal Computer working capabilities in MS Office (excel, word, PowerPoint, Adobe Writer, Visio, and basic Windows environment)

Position Summary:

Plans, directs and coordinates activities of designated capital projects. Reviews project proposal, establishes work plan and manages contractors to ensure project progresses on schedule and within budget.

Key Duties:

  • Construction Management including scheduling and financial management Quality Control and Safety.
  • Project Engineering including following specifications, design adaptation by ensure design and specifications meet codes and specification.
  • Sub-contractor management.
  • Administrative tasks such as scheduling meetings, minutes, maintaining documentation and customer liaison

Minimum Qualifications & Requirements:

  • Minimum Education Requirement - Bachelor’s Degree or equivalent experience
  • Minimum Management Experience - 5 years
  • Minimum Functional Experience - 3 years' work experience in facilities maintenance, plant operations or engineering services

Must Have:

  • Bachelor’s Degree or equivalent experience.
  • 4 years of direct project control experience with Primavera P6.
  • 3 years' work experience in facilities maintenance, plant operations or engineering services.
  • Working knowledge of project scheduling and documentation techniques and processes.
  • MS Project Experience.
  • Formal training in Project Scheduling techniques and associated software.
  • Strong Personal Computer working capabilities in MS Office (excel, word, PowerPoint, Adobe Writer, Visio, and basic Windows environment).
  • 5 years of Management Experience.
From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against Skyelia's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on Skyelia's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    Skyelia's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Nearby

Live postings like this one

Same employer first, then the same role elsewhere.

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.