Skip to content

Open nowFirst seen 2 days ago

Data Center Construction Manager

The GOR Group38 open roles

Where
Abilene, Texas, United States
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowData Center Construction ManagerThe GOR Group · Abilene, Texas, United States
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on The GOR Group's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

11.8% of postings close within 7 days. Measured by our own scanner across the market.

Share of postings closed within
  1. 2.1%1 day
  2. 4.4%3 days
  3. 11.8%7 days
  4. 18.6%14 days
  5. 35.6%30 days
  6. 45.1%60 days
This job: first seen 2 days ago

The posting

Construction Manager

Our Client designs, builds, and supports the world's most demanding digital infrastructure environments. We're searching for an experienced Data Center Construction Manager who thrives on large-scale, complex projects and knows how to lead field teams to deliver flawless structured cabling and low-voltage installations.

This is a senior, onsite leadership role where you'll take full ownership of construction execution—from day one planning through commissioning and closeout—ensuring projects are safe, on schedule, fully compliant, and built to the high standards.

If you're a detail-driven leader with deep technical expertise in fiber and structured cabling systems—and the ability to guide large field teams to operational excellence—you'll feel at home.

What You'll Lead

Own Safety as Priority #1

  • Model and enforce an Accident-Free Every Day safety culture.
  • Lead job site safety standards, compliance, and continuous improvement.
  • Support incident investigations, RCAs, and data-driven lessons learned.

Direct Data Center Construction Operations

  • Drive the development and implementation of project plans, installation strategies, and sitelogistics.
  • Maintain and manage 5-week look-ahead schedules, labor forecasts, and daily progress tracking.
  • Coordinate with Project Management and Procurement to ensure timely delivery and staging of materials.
  • Oversee daily field operations to meet or exceed production goals, budget, and schedule milestones.

Ensure Technical Excellence & Standards Compliance

  • Serve as the senior SME for data center, low voltage, structured cabling, and fiber installations.
  • Guarantee compliance with ANSI/TIA, BICSI, NEBS, and all customer specifications.
  • Lead testing and commissioning activities, including OTDR, power meter validation, labeling standards, and quality assurance protocols.
  • Identify design gaps, field conflicts, or changes; drive RFIs, clarifications, and scope adjustments.

Lead, Mentor & Develop Field Teams

  • Manage large (60+) field technician teams—union or nonunion.
  • Conduct hiring, training, performance evaluations, and career development for onsite personnel.
  • Provide technical coaching and mentorship to accelerate crew capabilities and elevate work quality.
  • Foster a culture grounded in safety, collaboration, accountability, and craftsmanship.

Be the Customer's Trusted Onsite Partner

  • Act as the main construction operations liaison for the client.
  • Participate in customer meetings, site walks, technical discussions, and milestone reviews.
  • Proactively address challenges around workflow, delays, installation issues, or tactical execution.

What You Need to Succeed

Leadership & People Skills

  • Proven ability to lead, motivate, and mentor diverse field teams.
  • Skilled in conflict resolution, workforce planning, and managing competing priorities.
  • Excellent written, verbal, and interpersonal communication skills.

Technical Expertise

  • Strong knowledge of OSHA regulations and best-in-class safety practices.
  • Mastery of low-voltage, fiber, and structured cabling installation in mission-critical environments.
  • Advanced capability in commissioning, system validation, and telecom quality control processes.
  • Ability to interpret complex drawings, specifications, and construction schedules.
  • Experience in identifying design discrepancies and managing technical change control.

Operational & Digital Skills

  • Ability to build and manage work activity sequencing and project phasing plans.
  • Strong computer skills: MS Office, Blue beam, Procore and construction management platforms.
  • Ability to quickly learn new construction technologies and workflow tools.

What You Bring

  • High School Diploma or GED required.
  • 3–5+ years of supervisory experience on large-scale structured cabling or data center construction projects.
  • Experience managing large, dispersed field teams (60+).
  • Data center new build or retrofit experience strongly preferred.
  • Experience working with union telecom crews and labor compliance required.
  • Preferred certifications:
  • OSHA30(or ability to obtain within 6 months)
  • BICSI Technician (TECH)
  • BICSI RCDD

About the GOR Group:

At GOR Group, we believe in Grit Over Resume.

We understand that great talent does not always come from a perfectly matched resume. While experience and technical skills matter, we know that some of the most successful professionals are those who demonstrate the character, determination, and drive to learn, adapt, and deliver results.

We value individuals who demonstrate:

  • Leadership
  • Accountability
  • Problem Solving
  • Adaptability
  • Strong Communication
  • Continuous Learning
  • A Willingness to Take on Challenges
  • A Strong Work Ethic
  • The Ability to Grow and Develop in New Environments

If your experience does not align with every requirement, but you believe you can make an impact, we encourage you to apply.

At GOR Group, we look beyond job titles and keyword matches. We focus on identifying individuals who bring the right attitude, work ethic, leadership, and technical capability to help our clients succeed. We partner with organizations across the mission critical, data center, manufacturing, commissioning, construction, and infrastructure industries to connect them with professionals who are ready to contribute, grow, and build meaningful careers.

If you're ready to help build the next generation of digital infrastructure while advancing your career in one of the fastest-growing industries in the world, we'd love to hear from you.

Know Someone Who Might Be a Fit?

GOR Group believes in Grit Over Resume. Great talent often comes through strong networks and referrals from industry professionals.

If you know someone in the mission critical, data center, manufacturing, commissioning, construction, or infrastructure industries who may be open to new opportunities, we offer a $500 referral bonus for successful placements. If your referral is hired and completes the required employment period, we'll reward you for helping connect great talent with great opportunities.

Reach out to our team to learn more about our referral program and current openings.

From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against The GOR Group's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on The GOR Group's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    The GOR Group's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Nearby

Live postings like this one

Same employer first, then the same role elsewhere.

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.