Skip to content

Open nowPosted 13 days ago

Commissioning Manager - Data Center Construction

KALCON31 open roles

Pay
$150,000 – $225,000 a year
Where
Cedar Rapids, IA
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowCommissioning Manager - Data Center ConstructionKALCON · Cedar Rapids, IA
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on KALCON's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

13.9% of postings close within 7 days. Measured by our own scanner across the market. KALCON postings stay open a median of 32 days.

Share of postings closed within
  1. 2.2%1 day
  2. 4.7%3 days
  3. 13.9%7 days
  4. 22.4%14 days
  5. 38.1%30 days
  6. 59.0%60 days
This job: posted 13 days ago

KALCON median: 32 days open

The posting

The Commissioning Manager serves as the Owner’s Representative responsible for oversight and coordination of the full commissioning lifecycle on large-scale, mission-critical data center projects. This role leads coordination among the General Contractor, commissioning agents, MEP subcontractors, design teams, and Owner personnel to ensure systems are installed, started up, and tested in accordance with Owner specifications and project requirements. The Commissioning Manager develops and maintains the Commissioning Plan and Schedule, tracks readiness, deficiencies, and documentation, and reports on commissioning progress and KPIs to protect turnover milestones and support a clean, timely handover.

Minimum Qualifications:

  • Bachelor’s degree in Construction Management, Engineering, or a related field preferred, but not required with equivalent trade or superintendent experience
  • 7–10+ years of construction or commissioning experience, with at least 5 years in data center projects
  • Proven experience supporting commissioning of mission-critical facilities such as data centers, semiconductor facilities, or laboratories
  • In-depth understanding of MEP systems, controls integration, and commissioning standards (ASHRAE, NEBB, etc.)
  • Ability to read and interpret multi-disciplinary construction drawings and specifications
  • Strong written and oral communication skills with the ability to coordinate with stakeholders at all levels
  • Proficiency in Microsoft Office Suite, particularly Excel and PowerPoint
  • Familiarity with commissioning and project software tools such as CxAlloy, Bluebeam, and Procore

Tasks and Responsibilities:

  • Serve as the Owner’s Representative overseeing the full commissioning lifecycle of large-scale, mission-critical data center projects
  • Lead coordination with all commissioning stakeholders, including the General Contractor, commissioning agents, MEP subcontractors, design teams, and Owner personnel
  • Develop and maintain the project Commissioning Plan and Commissioning Schedule, ensuring alignment with construction and turnover milestones
  • Collaborate with technical and subject matter experts to draft and review commissioning process documentation in compliance with company and project standards
  • Review multi-disciplinary construction drawings and specifications to anticipate and mitigate commissioning-related issues
  • Work with the General Contractor and subcontractors to verify that systems are installed and tested in accordance with Owner specifications, state and local codes (UMC, UBC, UPC, NFPA), SMACNA, ASME, and relevant international standards
  • Support development of detailed start-up sequences and ensure alignment with the project schedule, developing workarounds and recovery plans where required
  • Administer and maintain the commissioning software platform (e.g., CxAlloy), tracking issues, checklists, test results, and closeout documentation
  • Coordinate and manage the sequencing of equipment and system start-up activities
  • Monitor and track commissioning-related RFIs, submittals, deficiency items, and action items across all active systems
  • Conduct and document routine site walks (minimum twice daily) to confirm field readiness for commissioning activities and verify completion of corrective actions
  • Interface with General Contractor Cx Managers, engineers, system owners, and vendor technicians to ensure readiness and alignment on testing protocols and responsibilities
  • Lead and participate in oversight of Factory Acceptance Tests (FATs), Site Acceptance Tests (SATs), and Integrated Systems Testing (IST), ensuring responsible parties complete required testing and documentation
  • Manage and report on commissioning Key Performance Indicators (KPIs) to internal and external stakeholders, including senior project management
  • Act as the primary liaison for commissioning activities in Owner-Architect-Contractor (OAC) meetings
  • Verify that commissioning documentation meets turnover requirements and supports a clean and timely handover
  • Participate in SOP creation and compliance reviews, including audits of SIPPs and Pre-Task Plans
  • Resolve technical questions from the field, provide RFI responses, and coordinate with design teams for clarification as needed

Benefits Offered:

  • Medical insurance
  • Dental insurance
  • Vision insurance
  • Life insurance
  • Accident insurance
  • Long term disability
  • 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
  • 15 days of paid time off
  • 8 paid national holidays
  • Reimbursement for professional licenses and certifications

Submission Requirements:

At a minimum, the candidate’s professional resume must include the following:

  • List of all Educational Achievements
  • List of all Professional Licenses or Certificates
  • List of Awards Received
  • Detailed Employment History with each company including: o Name & Contact Information of the firm or agency o Start Date and End Date (Month & Year) o Positions Held o List of Projects/Programs Managed including project value, location of assignment, roles and responsibilities, and contribution to each project

At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicants and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.

Salary Range

$150,000—$225,000 USD

From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against KALCON's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on KALCON's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    KALCON's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.