Skip to content

Open nowPosted 13 days agoWe saw it 48 min after it went up

Safety Manager - Data Center Construction

KALCON31 open roles

Pay
$150,000 – $200,000 a year
Where
Abernathy, TX
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowSafety Manager - Data Center ConstructionKALCON · Abernathy, TX
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on KALCON's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

13.9% of postings close within 7 days. Measured by our own scanner across the market. KALCON postings stay open a median of 32 days.

Share of postings closed within
  1. 2.2%1 day
  2. 4.7%3 days
  3. 13.9%7 days
  4. 22.4%14 days
  5. 38.1%30 days
  6. 59.0%60 days
This job: posted 13 days ago

KALCON median: 32 days open

The posting

KALCON is seeking an experienced Safety Manager with 7-10+ years of construction safety experience supporting mission critical, data center, semiconductor, or other complex vertical construction projects. As an Owner's Representative, this individual will provide field safety oversight, conduct site inspections and audits, monitor contractor compliance with OSHA and project safety requirements, and deliver daily reporting and risk assessments to help ensure safe, compliant project execution. The ideal candidate will hold a current CSP or CHST certification, OSHA 30 (or OSHA 500/502), and First Aid/CPR certification, while demonstrating strong communication, leadership, and organizational skills with the ability to effectively collaborate across project teams and manage multiple active jobsites.

Minimum Required Qualifications: - Minimum 7 to 10 years construction/safety experience in critical facilities, mission critical, semiconductor, or similar scope projects primarily for vertical building construction. - Effective communication skills and ability to work with all levels of the project team. - Evidence of completing OSHA 30 Hour Construction Outreach Training within the last three years. In the alternative, evidence of completing the OSHA 500 or OSHA 502 Class may be provided. - Current First Aid and CPR training from a provider recognized by OSHA. - Minimum of holding a valid Certified Safety Professional (CSP) or Construction Health and Safety Technician (CHST) certificate issued by the BCSP Board of Certified Safety Professionals. - Flexibility in schedule and transportation to work at multiple sites based on assigned schedule and duties and perform time management as required to meet all the position requirements. - Proficiency with Microsoft office and related spreadsheet and database software. - Ability to provide management oversight on behalf of the Owner and effectively complete reporting on a daily basis as required by the program.

Tasks and Responsibilities: - Look ahead on high-risk activities and assisting with risk analysis of upcoming work. - Produce daily observations and indicator/trend reports on Procure. - Monitor compliance with site safety programs and requirements, which defines safety requirements that contractors must comply with while working as an Owner's Representative on Data Center projects. - Perform Daily Safety reviews of work in progress in accordance with current Safety Regulations and Standard Operating Procedures (SOP). - Conducts construction site safety audits to identify improper procedures, checks equipment and facilities for hazardous conditions and recommends corrective actions. - Audit and review Methods of Procedures (MOPs) for safety compliance and to minimize site impacts. - Submit Daily, Weekly, and Monthly Safety reports required by the Program. - Monitor compliance to all current OSHA requirements that relate to the specific construction projects. - Report to the Director of Safety, including but not limited to, attending any required meetings or providing safety reports/analysis as requested. - Immediately notify the Director of Safety of any incident or recordable injury on projects. - Monitor Contractor compliance with COVID-19 regulations as defined by city, state, and OSHA guidelines. Confirm that Contractor Safety Plans are complete and updated to address COVID Safety Guidelines on each project site. - Confirm that Contractor is reporting all recordable injuries and near-miss incidents within the required timelines and by filing the proper forms. Review the report for accuracy before filing. - Review and provide comments to the Owner on the project-specific "Project Health, Safety & Environmental Plan" as prepared by the Owner or the Contractor. - Perform ongoing construction site safety inspections and generate safety report for all site visits. - Identify site safety hazards and provide immediate direction to contractor safety representative to eliminate or mitigate them. - Perform reviews and inspections of the jobsite to assure compliance with health and safety regulations and applicable codes. - Participate in site inspections and testing as necessary for required permits, including confined space, hot work, trenching, etc. - Confirm that the New Hire Safety Orientation on-line safety training are available onsite. - Confirm that contractors are performing tailgate safety meetings and training as required by their Contract and/or OSHA requirements. - Attend pre-construction meetings to present Owner's safety program and the role of the field safety representative. Provide comprehensive safety support and guidance for Project Team. - Monitor adherence to zero tolerance and corrective action policy for workers found not in compliance with the Program's safety policy. - Conduct project safety stand-downs with all crews to review the incident for injuries. Educate all site workers on how to prevent a repeat accident.

Benefits Offered: • Medical insurance • Dental insurance • Vision insurance

• Life Insurance

• Accident Insurance

• Long Term Disability • 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5% • 15 days of paid time off • 8 paid national holidays • Reimbursement for professional licenses and certifications

Submission Requirements: At a minimum, the candidate's professional resume must include the following: - List of all Educational Achievements - List of all Professional Licenses or Certificates - List of Awards Received - Detailed Employment History with each company o Name of the firm or agency o Start Date and End Date (Month & Year) o Positions Held o List of Projects/Programs Managed including project value, location of assignment, roles and responsibilities and contribution to each project

At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicant and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.

Salary Range

$150,000—$200,000 USD

From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against KALCON's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on KALCON's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    KALCON's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.