Skip to content

Open nowPosted 13 days agoWe saw it 29 min after it went up

TFO Field Project Manager - Data Center Construction

KALCON31 open roles

Pay
$140,000 – $220,000 a year
Where
Richmond, VA
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowTFO Field Project Manager - Data Center ConstructionKALCON · Richmond, VA
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on KALCON's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

13.9% of postings close within 7 days. Measured by our own scanner across the market. KALCON postings stay open a median of 32 days.

Share of postings closed within
  1. 2.2%1 day
  2. 4.7%3 days
  3. 13.9%7 days
  4. 22.4%14 days
  5. 38.1%30 days
  6. 59.0%60 days
This job: posted 13 days ago

KALCON median: 32 days open

The posting

KALCON is seeking an experienced TFO Field Project Manager (Owner’s Representative) to provide on-site leadership and owner representation during the tenant fit-out of mission-critical data center facilities. This role is heavily field-focused and responsible for overseeing construction execution, safety, schedule performance, quality assurance, commissioning activities, logistics coordination, and integration between base building and tenant improvement work. The ideal candidate is a proactive construction professional with data center, critical facilities, semiconductor, or similar complex project experience who can effectively manage contractors, drive accountability, resolve field challenges, and ensure projects are delivered safely, on schedule, within budget, and in alignment with the owner’s objectives. This position requires a strong understanding of construction means and methods, commissioning processes, MEP systems, and fast-paced project environments where daily field presence and hands-on leadership are essential.

Minimum Qualifications:

  • - Bachelor's degree in construction management or engineering, or applicable trade/superintendent experience.
  • - 7-10 years of experience working in either design or construction of projects. Experience in Labs, Semiconductor, Data Center, and/or Critical Facility Construction is necessary.
  • - Proficient use of MS-Word, Excel, PowerPoint, Project
  • - Strong written and oral communication skills to exchange information with senior management, service providers, workers, and contractors

Tasks and Responsibilities: Field Management Focused - Safety Oversight - Schedule Oversight - Day-to-Day Tracking/Management - Owner/GC Coordination: Base Build GC vs. Fit-Out GC - MOP Coordination - Delivery Coordination - Site Logistics Coordination - QA/QC - Diving Into Plans/Specs - Understand Design Intent/Scope/Etc. - Ensuring GC is Executing QA/QC Plan (Project Specific) - Tenant Fit-Out Experience: Fast Paced Schedule - Busway/RPP's, Hot Aisle Containment, Conveyance, Etc. - Existing Buildings Retrofits: Added CRAH's, Power/Cooling, PQM Retrofit, Etc. - Commissioning - Submittals, RFI's, Procurement Log - Other Items: - OFCI Tracking - OAC Meetings - GC Weekly Reports, Safety Metrics - Must be on the job 5 day a week 6:30-3:30 Other Responsibilities (secondary): - Design Management - Budget/Cost - Change Management - Pay Apps Schedule: - Review construction manager's (CM) monthly forecast. - Hold weekly CPM schedule review meetings - Attend multiple CM/subcontractor detailed planning meetings - Owner Furnished Contractor Installed (OFCI) equipment schedule management - Vendor start up scheduling - Commissioning schedule coordination - Owner/Direct vendor schedule management (IT, Roofing Consultant, Geotech, Third Party Inspectors) - Customer Fitout - schedule management - Customer Fitout - Phase turn over alignment (base build & Tenant) Cost: - GMP buyout review and support - GMP buyout detailed analysis and ownership of recommendations - Provide VE recommendations with analysis - Change order review and approval (cost approval and process flow) - Proactive cost avoidance/reduction ideas - Monthly pay application review Field: - QA/QC general oversight - QA/QC daily review and inspection with CM - Safety general oversight - Safety daily review & inspection with CM - facility coordination (MOP's, Notifications) - Assess weekly progress and provide accurate reporting - Manage OFCI equipment inspection/receiving process Project Management: - Process cost documents (pay apps, change orders, etc.) - Manage and attend weekly OAC meetings and minutes - Provide weekly project reporting - Manage project closeout process (financial, O&M's, punchlist, Ops, etc.) Design: - After initial design, manage design coordination efforts - Coordinate customer fit out design package integration (non base-build) - Validate design cost and process changes - Management of construction administration process Permit/AHJ: - Manage and communicate overall permit process - AHJ inspection and certificate of occupancy process management.

Benefits Offered:

  • Medical insurance
  • Dental Insurance
  • Vision Insurance
  • 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
  • 15 days of paid time off
  • 8 paid National Holidays
  • Reimbursement for professional licenses and certifications

Submission Requirements: At a minimum, the candidate's professional resume must include the following: - List of all Educational Achievements - List of all Professional Licenses or Certificates - List of Awards Received - Detailed Employment History with each company o Name of the firm or agency o Start Date and End Date (Month & Year) o Positions Held o List of Projects/Programs Managed including project value, location of assignment, roles and responsibilities and contribution to each project

At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicant and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.

Salary Range

$140,000—$220,000 USD

From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against KALCON's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on KALCON's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    KALCON's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.