Skip to content

Open nowPosted 10 days ago

Field Analyst - Data Center Construction

KALCON31 open roles

Where
Quinlan, TX
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowField Analyst - Data Center ConstructionKALCON · Quinlan, TX
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on KALCON's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

13.9% of postings close within 7 days. Measured by our own scanner across the market. KALCON postings stay open a median of 32 days.

Share of postings closed within
  1. 2.2%1 day
  2. 4.7%3 days
  3. 13.9%7 days
  4. 22.4%14 days
  5. 38.1%30 days
  6. 59.0%60 days
This job: posted 10 days ago

KALCON median: 32 days open

The posting

The Field Schedule Analyst serves as the Owner’s Representative responsible for independent, field-based verification of construction progress and alignment with the master schedule. This role is on site a minimum of three days per week, performing physical walkdowns, validating installed quantities, and engaging directly with the General Contractor and subcontractor field teams. The remaining time is dedicated to compiling verified quantities and preparing weekly progress data for the scheduling team. The Analyst confirms that reported actuals match physical work in place, identifies sequencing, access, and logistics risks to schedule adherence, and tracks constraints and missed commitments to resolution. The objective is to give the project team and the scheduling team a single, verified picture of progress.

Minimum Qualifications:

  • Construction field experience with a working understanding of trade sequencing, means and methods, and installation rates
  • Familiarity with CPM scheduling concepts and Primavera P6, with the ability to read and interpret schedule activities and look-aheads
  • Proficiency with quantity tracking tools (Excel or equivalent) and the ability to maintain organized, auditable records
  • Ability to perform physical progress verification in active construction environments and to be on site a minimum of three days per week
  • Strong communication skills and the confidence to constructively question reported progress with subcontractor field leadership
  • Ability to coordinate effectively with General Contractor superintendents, subcontractor foremen and project managers, and scheduling team members
  • Bachelor’s degree in Engineering, Construction Management, or a related field preferred, but not required with equivalent experience

Duties and Responsibilities:

Field Verification and Quantity Tracking

  • Verify daily and weekly installed quantities and construction progress through physical walkdowns of active work areas
  • Validate subcontractor-reported actuals against physical work in place, by system, area, and activity
  • Maintain a running quantity tracking log by trade and work area that ties back to schedule activities and the project quantity basis
  • Prepare daily field verification notes and photo documentation

Schedule Alignment

  • Compare field progress against the master schedule, the current look-ahead, and upcoming commitments
  • Challenge discrepancies between reported progress and actual field conditions, and escalate unresolved variances to the project team
  • Identify sequencing conflicts, trade stacking, and access or logistics issues that threaten schedule adherence, and recommend corrective adjustments
  • Identify opportunities to improve schedule adherence, including re-sequencing, resource reallocation, and work-front optimization
  • Maintain a variance log of discrepancies between reported and verified progress, with resolution status

Subcontractor Coordination

  • Coordinate with subcontractor foremen and superintendents to confirm planned versus completed work on a daily basis
  • Identify missed commitments, constraints, and roadblocks (materials, manpower, access, RFIs, inspections) and track them to resolution
  • Work with subcontractors to define realistic recovery plans and confirm that recovery commitments are reflected in the look-ahead
  • Maintain a constraint and missed-commitment log with recovery actions and responsible parties

Progress Reporting

  • Provide accurate, verified weekly progress data to the project scheduling team in the agreed format and cadence to support schedule updates
  • Prepare a weekly verified installed-quantity and percent-complete report by trade and area
  • Flag activities that are reported complete but not physically complete, or physically complete but not yet reported, prior to each update cycle
  • Participate in weekly schedule review meetings and provide a field-based perspective on progress and forecast dates
  • Report to the KALCON Project Controls / Scheduling Lead, with day-to-day direction from the client project team

Benefits Offered:

  • Medical insurance
  • Dental insurance
  • Vision insurance
  • Life insurance
  • Accident insurance
  • Long term disability
  • 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
  • 15 days of paid time off
  • 8 paid national holidays
  • Reimbursement for professional licenses and certifications

Submission Requirements:

At a minimum, the candidate’s professional resume must include the following:

  • List of all Educational Achievements
  • List of all Professional Licenses or Certificates
  • List of Awards Received
  • Detailed Employment History with each company including: Name & Contact Information of the firm or agency Start Date and End Date (Month & Year) Positions Held

At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicant and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.

From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against KALCON's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on KALCON's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    KALCON's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.