Skip to content

Open nowPosted 127 days ago

Project Engineer - Data Center Construction

KALCON31 open roles

Pay
$80,000 – $120,000 a year
Where
Portsmouth, OH
Get the CV for this job

From $25 per CV, paid once. No subscription.

Your applicationOpen nowProject Engineer - Data Center ConstructionKALCON · Portsmouth, OH
  1. YouYes, apply to this one.

  2. CV RocketCV written for this posting.

  3. 25 readersRecruiter, hiring manager, skeptic. Round after round.

  4. CV RocketApplied on KALCON's own form.

The reply lands in your private mailbox

3×more interviews than doing it yourself with ChatGPT.

The clock on this job

Early applications get read.

13.9% of postings close within 7 days. Measured by our own scanner across the market. KALCON postings stay open a median of 32 days.

Share of postings closed within
  1. 2.2%1 day
  2. 4.7%3 days
  3. 13.9%7 days
  4. 22.4%14 days
  5. 38.1%30 days
  6. 59.0%60 days
This job: posted 127 days ago

KALCON median: 32 days open

The posting

KALCON is looking for a self-starting Project Engineer to drive core project coordination efforts as an Owner’s Representative during the tenant fit-out of one or multiple buildings on a critical data center campus. Daily tasks include submittal/RFI workflow management, change order management, design coordination, project closeout management, payment application reviews, participation in commissioning, and coordination of construction activities with the full-time Operations staff. Regular collaboration and coordination are required with internal resources and external contractors.

Minimum Qualifications: • Bachelor of Science in Construction Management, or similar field, or equivalent experience • 1-3 years of experience as a Project Engineer in assisting or supervising construction projects of increasing complexity required • Data Center experience is a preferred • Experience in CSA (civil, structural, architectural) and MEP (mechanical, electrical, plumbing) construction management is a strong preference • Proficiency in Procore is strongly preferred

Project Specific Duties and Responsibilities: • Biweekly review of schedule updates. • Walking the site daily to validate install against schedule from a high level. • Liaison between our procurement team and the GC related to OFCI equipment • Maintaining Client agendas and meeting minutes. • Perform two on-site safety observations per week. • Assist with review of pay applications and filing of lien waivers. • Coordinate with internal stakeholders on project schedule and procurement. • Maintain a great relationship with peers on the general contractor’s team. • Assist with document control and issue closeout during commissioning. • Process POs and Change Orders. • Lead smaller meetings and document meeting notes throughout project life cycle. • Management of Procore directory, monthly updates, and GC Procore document control.

Duties and Responsibilities: • Coordinate internal alignment on project document reviews, cost optimization exercises, contract issuances and design modifications • Enforce project quality controls and safety programs through an in-depth understanding of the partner contracts and design documents • Manage the Client safety program and provide weekly HRA site walk reports. Two (2) HRA site walks are required per week to provide accurate safety metrics to the Client EHCS department • Translate job requirements to execution with minimal supervision • Assist construction manager in preparing monthly financial updates and forecasts • Manage the Contractor billing process for the project and facilitate coordination with the Client CCF department to ensure accuracy of scope included in each bill and timely review of all pay applications • Manage the change order review process turnkey. Provide timely review of change orders for accuracy of scope and costs • Input PO requests in the financial system and manage the distribution process to all Client vendors

• Facilitate page-turn design document reviews and capture comments with action items for internal stakeholders and direct contracted design partners • Manage Client vendors turnkey to ensure successful completion of their scope (ie. Signage, Furniture, and Controls) • As required, manage design team/contractors throughout each project • Work closely with Operations to coordinate ongoing construction activities on campus, develops and tracks MOPs for critical work in live spaces, and provide customer support as necessary • Provide project commissioning support by onboarding the Commissioning Agent, facilitating script approvals and ensuring compliance with customer requirements • Manage and maintain internal project file storage • Drive internal and external project closeout requirements • Assist the Construction department with the upkeep of current campus and site permits, update the permit bond tracking sheet, and coordinate with local authorities to ensure all permits are current • Additional duties as assigned from time to time by Management

Benefits Offered: • Medical insurance • Dental insurance • Vision insurance

• Life Insurance

• Accident Insurance

• Long Term Disability • 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5% • 15 days of paid time off • 8 paid national holidays • Reimbursement for professional licenses and certifications

Submission Requirements: At a minimum, the candidate’s professional resume must include the following: • List of all Educational Achievements • List of all Professional Licenses or Certificates • List of Awards Received • Detailed Employment History with each company or government agency including: o Name & Contact Information of the firm or agency o Start Date and End Date (Month & Year) o Positions Held

At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicant and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.

Salary Range

$80,000—$120,000 USD

From $25, paid onceGet the CV for this job

What happens when you press

One press. We do the rest.

  1. A CV for this posting

    Written against KALCON's own wording, from every piece of relevant proof in your profile.

  2. 25 readers review it

    Recruiter, hiring manager, skeptic and more read every draft, round after round. You get the best round.

    The review screen in CV Rocket: how each CV was read, round by round.
  3. We apply on KALCON's form

    Our application engine gets through the hardest forms there are. Where a question needs you, AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

    An application in CV Rocket: every answer filled in on the employer's form.
  4. Every reply, sorted

    KALCON's answer lands in your private mailbox, and we classify it on arrival: interview, question, rejection.

    The CV Rocket inbox: each employer reply classified as an interview, an action or a rejection.
  5. Reply with AI

    AI helps you write the email, checks it and sends it. We show you whether the recruiter read it.

  6. The interview in your calendar

    Full integration with your calendar. The invitation goes straight in.

    An interview invitation in the CV Rocket inbox, added to the candidate's calendar.
Get the CV for this job

From $25 per CV, paid once. No subscription.

Why it works

3×

more interviews than doing it yourself with ChatGPT.

ChatGPT writes a CV and never learns what happened to it. We see every reply. For each CV we know:

  • How it was written, and how the review scored it
  • When we applied, and how long after the posting went up
  • Which posting, which company, which city
  • Who got the interview, and who heard nothing

That is how we know which CVs get called.

Get the CV for this job

From $25 per CV, paid once. No subscription.

The numbers game

More applications. More interviews.

Every application goes out with its own CV, written for that posting and paid once. Send enough of them and the law of large numbers finds you the job.

By hand5–10
With CV Rocket100
applications a day

Before you press

Straight answers

Get the CV for this job

From $25 per CV, paid once. No subscription.

What if my background isn't good enough?

We make the most of the background you have. The CV uses every piece of relevant proof your profile holds, and one of the 25 readers reads your whole profile and flags what the CV left out.

Do you really apply for me?

Yes, on the employer's own form, the hardest ones included. Where a question needs you, you answer it right there and AI suggests the best answer. Don't want us applying from our IP addresses? Use our Chrome extension: we apply straight from your own browser.

Is it a subscription?

No. You pay once per CV, from $25. Every application goes out with its own CV, written for that posting.

One job. One CV.
Paid once.

Pick the posting you want. We write for it, apply for you and catch the reply.

Get the CV for this job

From $25 per CV, paid once. No subscription.